flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Structure Tone pleads guilty to charge of arranging inflated subcontractor bills

Structure Tone pleads guilty to charge of arranging inflated subcontractor bills

Construction firm acknowledges defrauding customers and will pay a $55 million forfeiture penalty.


By BD+C Staff | May 2, 2014

Structure Tone, a global construction services firm with annual revenues of over $3 billion, will pay a $55 million forfeiture after pleading guilty to felony charges. The lawsuit in the State Supreme Court, in Manhattan, alleged that the New York-based firm had its subcontractors, including electrical, drywall, and plumbing subs, inflate bills for the company's clients. The work in question included jobs for Bank of America, Moody's, Proskauer Rose, Bloomberg, and other customers from 2005 to 2009.

A report in the New York Times indicates that Structure Tone pled guilty to one count of falsifying business records in the first degree, a felony. David Szuchman, the chief of investigations for the district attorney, says Structure Tone became aware of the investigation in 2010 and put new safeguards in place; Szuchman's office continues to monitor the firm's business records and will do so for three years.

When functioning as a CM, Structure Tone asked subs to put unnecessary contingencies in an addendum called "Rider B," which was unknown to Structure Tone's clients. Execs also asked for discounts from subs on lump sum contracts, when the firm was working as a GC.

The company issued a statement as follows:

“The record-keeping issues, which form the basis of this agreement, date back to the period 2005 to 2009, and we have fully cooperated with authorities from the beginning. The financial position of our company — which generates $3 billion annually in revenue — continues to be strong. Long before this process began, we strengthened our compliance protocols to improve transparency.”

Related Stories

| Apr 3, 2013

AIA CES class: Sealant repairs that last – hybrid sealants for building restoration

It is hard to talk about restoration without talking about sustainability. This two-hour interactive online course discusses the role that restoration can and does play in the arena of sustainability, and specifically the role that sealants play in sustainable design and repair.

| Apr 3, 2013

Construction spending up 20% since 2011, growth will continue, says Gilbane report

The monthly rate of construction spending is up 20% in 24 months and increased in 18 of the last 24 months, which is a good leading indicator for new construction work in Q3-Q4 2013, according to Gilbane's latest Market Conditions in Construction report.

| Apr 3, 2013

5 award-winning modular buildings

The Modular Building Institute recently revealed the winners of its annual Awards of Distinction contest. There were 42 winners in all across six categories. Here are five projects that caught our eye.

| Apr 2, 2013

6 lobby design tips

If you do hotels, schools, student unions, office buildings, performing arts centers, transportation facilities, or any structure with a lobby, here are six principles from healthcare lobby design that make for happier users—and more satisfied owners.

| Apr 2, 2013

Green building consultant explores the truth about green building performance in new book

A new book from leading sustainability, green building author and expert Jerry Yudelson challenges assumptions about the value of sustainable design and environmentally-friendly buildings.

| Mar 29, 2013

M+W Group acquires LifeTek Solutions in America

  The global engineering and construction company M+W Group has announced  that their operations in the Americas have acquired 100% ownership of LifeTek  Solutions, Inc.

| Mar 29, 2013

PBS broadcast to highlight '10 Buildings That Changed America'

WTTW Chicago, in partnership with the Society of Architectural Historians, has produced "10 Builidngs That Changed America," a TV show set to air May 12 on PBS.

| Mar 29, 2013

Shenzhen projects halted as Chinese officials find substandard concrete

Construction on multiple projects in Guangdong Province—including the 660-m Ping'an Finance Center—has been halted after inspectors in Shenzhen, China, have found at least 15 local plants producing concrete with unprocessed sea sand, which undermines building stabity.

| Mar 27, 2013

Small but mighty: Berkeley public library’s net-zero gem

The Building Team for Berkeley, Calif.’s new 9,500-sf West Branch library aims to achieve net-zero—and possibly net-positive—energy performance with the help of clever passive design techniques.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021