Kaohsiung Stadium, the main venue of the 2009 World Games, made its spectacular debut in July 2009. Designed by Toyo Ito & Associates, one of the top architects in Japan, and Ricky Liu & Associates from Taiwan, the stadium can hold 45,000 spectators.
In addition to its eye-catching, horseshoe-shaped appearance, the building is the first stadium in the world powered by solar energy, and has been awarded the “Green Building Certification” by the Taiwan authorities.
Search for an effective panel fixing solution
In order to maximize the natural daylight, 8,844 solar panels were strategically mounted around the roof of the stadium. The solar panels generate more than one million kilowatt-hours of electricity per year, which supports approximately 80 percent of the stadium’s energy needs. To achieve this success, architects and contractors needed to resolve a series of technical issues related to the built-in panels. The job required an effective panel fixing design with optimum energy transfer rate, plus excellent thermal and weathertight performance.
Four-sided structural sealant glazing saves the day
Dow Corning was consulted from the very beginning of the project, and ultimately recommended using four-sided structural sealant glazing to bond the glass solar panels to aluminum sub-frame. This approach maximizes the daylight exposure and hence the generation of clean solar energy by the solar modules. Each unit of the roof façade system has three glass panels, including two solar glass panels (containing solar cell and low-iron glass panels) and one blue tinted tempered glass pane. Dow Corning 983 Structural Glazing Sealant was used for bonding the solar panels and weatherproofing.
Key Participants
Construction Office, Public Works Bureau, Kaohsiung City Government
Toyo Ito & Associates
Ricky Liu & Associates
Fu Tsu Construction
Delta Electronics Inc.
Dow Corning - Silicone Sealant ProviderProducts
Dow Corning 983 Structural Glazing Sealant
With the proven, silicone-bonding technology, the structural silicone not only helps this horseshoe-shaped solar roof building withstand earthquakes, acid rain, typhoons, humidity and extreme heat and UV radiation, but also improves its thermal and acoustic performance by continuous and effective sealing the facade. Dow Corning provides a complete solution, including high performance sealants and professional technical support, which ensures correct sealant application and long-term performance.
Leading the way for more BIPV success
The Kaohsiung World Games Main Stadium was the first 4-sided structurally glazed BIPV (Building Integrated Photovoltaic) roofing project that Dow Corning participated in Greater China. It is one of the largest BIPV projects in Greater China. Dow Corning silicone structural sealants allow creativity and design freedom, combined with lower life-cycle cost and improved thermal and acoustic performance of the facade. Dow Corning structural glazing sealants are now widely used in major BIPV facades in China, including the 2010 World Expo China, National Pavilion and Theme Pavilion.
Click here to view a short animated presentation about how Dow Corning solutions and support helped to create this revolutionary solar-powered stadium.
Or, to learn more about the Dow Corning products featured in this case study, as well as our many other proven materials for the construction industry, please click here. To speak to your nearest Dow Corning representative, visit dowcorning.com/ContactUs. +
Related Stories
| Jun 7, 2013
40 Under 40 retrospective: Where are they now?
Every month we’ll be catching up with past 40 Under 40 honorees to see what they’ve been up to since winning the award. This month we focus on a construction manager and a healthcare designer.
| Jun 7, 2013
First look: University of Utah's ‘teaching hospital for law’
The University of Utah broke ground on its cutting-edge College of Law building, which will facilitate new approaches to legal education based on more hands-on learning and skills training.
| Jun 7, 2013
First look: Austin breaks ground on 'light-filled' Central Library
The design scheme by Lake|Flato and Shepley Bulfinch incorporates reading "porches" and a light-filled, six-story atrium.
| Jun 5, 2013
Survey of AE firms shows profits, hiring on the rise
A recent survey of more than 40 Boston-area architecture and engineering companies by consulting firm DiCicco, Gulman & Company confirms continued growth in business volume.
| Jun 5, 2013
USGBC: Free LEED certification for projects in new markets
In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.
| Jun 4, 2013
SOM research project examines viability of timber-framed skyscraper
In a report released today, Skidmore, Owings & Merrill discussed the results of the Timber Tower Research Project: an examination of whether a viable 400-ft, 42-story building could be created with timber framing. The structural type could reduce the carbon footprint of tall buildings by up to 75%.
| Jun 4, 2013
Notification reinvented: SimplexGrinnell introduces revolutionary family of intelligent notification appliances
Simplex TrueAlert ES uses addressable technology to improve protection, simplify installation and reduce operating costs.
| Jun 3, 2013
6 residential projects named 'best in housing design' by AIA
The Via Verde mixed-use development in Bronx, N.Y., and a student housing complex in Seattle are among the winners of AIA's 2013 Housing Awards.
| Jun 3, 2013
Trifecta of awards recognize Vision/Rubenstein campus, Bayer Healthcare HQ
When Vision Equities, LLC and Rubenstein Partners purchased the 200-acre former Alcatel-Lucent campus in Whippany a little more than two years ago, the partnership recognized the property’s potential to serve as a benchmark infill revitalization for the State of New Jersey.
| May 31, 2013
Nation's first retrofitted zero-energy building opens in California
The new training facility for IBEW/NECA is the first commercial building retrofit designed to meet the U.S. Department of Energy’s requirements for a net-zero energy building.