Kaohsiung Stadium, the main venue of the 2009 World Games, made its spectacular debut in July 2009. Designed by Toyo Ito & Associates, one of the top architects in Japan, and Ricky Liu & Associates from Taiwan, the stadium can hold 45,000 spectators.
In addition to its eye-catching, horseshoe-shaped appearance, the building is the first stadium in the world powered by solar energy, and has been awarded the “Green Building Certification” by the Taiwan authorities.
Search for an effective panel fixing solution
In order to maximize the natural daylight, 8,844 solar panels were strategically mounted around the roof of the stadium. The solar panels generate more than one million kilowatt-hours of electricity per year, which supports approximately 80 percent of the stadium’s energy needs. To achieve this success, architects and contractors needed to resolve a series of technical issues related to the built-in panels. The job required an effective panel fixing design with optimum energy transfer rate, plus excellent thermal and weathertight performance.
Four-sided structural sealant glazing saves the day
Dow Corning was consulted from the very beginning of the project, and ultimately recommended using four-sided structural sealant glazing to bond the glass solar panels to aluminum sub-frame. This approach maximizes the daylight exposure and hence the generation of clean solar energy by the solar modules. Each unit of the roof façade system has three glass panels, including two solar glass panels (containing solar cell and low-iron glass panels) and one blue tinted tempered glass pane. Dow Corning 983 Structural Glazing Sealant was used for bonding the solar panels and weatherproofing.
Key Participants
Construction Office, Public Works Bureau, Kaohsiung City Government
Toyo Ito & Associates
Ricky Liu & Associates
Fu Tsu Construction
Delta Electronics Inc.
Dow Corning - Silicone Sealant ProviderProducts
Dow Corning 983 Structural Glazing Sealant
With the proven, silicone-bonding technology, the structural silicone not only helps this horseshoe-shaped solar roof building withstand earthquakes, acid rain, typhoons, humidity and extreme heat and UV radiation, but also improves its thermal and acoustic performance by continuous and effective sealing the facade. Dow Corning provides a complete solution, including high performance sealants and professional technical support, which ensures correct sealant application and long-term performance.
Leading the way for more BIPV success
The Kaohsiung World Games Main Stadium was the first 4-sided structurally glazed BIPV (Building Integrated Photovoltaic) roofing project that Dow Corning participated in Greater China. It is one of the largest BIPV projects in Greater China. Dow Corning silicone structural sealants allow creativity and design freedom, combined with lower life-cycle cost and improved thermal and acoustic performance of the facade. Dow Corning structural glazing sealants are now widely used in major BIPV facades in China, including the 2010 World Expo China, National Pavilion and Theme Pavilion.
Click here to view a short animated presentation about how Dow Corning solutions and support helped to create this revolutionary solar-powered stadium.
Or, to learn more about the Dow Corning products featured in this case study, as well as our many other proven materials for the construction industry, please click here. To speak to your nearest Dow Corning representative, visit dowcorning.com/ContactUs. +
Related Stories
| Jun 11, 2018
Accelerate Live! talk: ‘AEC can has Blockchains?’
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), HOK’s Greg Schleusner explores how the AEC industry could adapt the best ideas from other industries (banking, manufacturing, tech) to modernize inefficient design and construction processes.
| Jun 11, 2018
Accelerate Live! talk: How advanced digital fabrication techniques are driving design innovation
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), SOM’s Lucas Tryggestad and Kyle Vansice present the firm’s 3D-printed building project and explore how digital fabrication is pushing design innovation.
| Jun 11, 2018
Accelerate Live! talk: AEC + Data + AI — Poison for some, elixir for others
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), predictive analytics expert David Morgareidge offers steps that AE firms can take today if they want to survive AECO digital transformation.
Education Facilities | Jun 8, 2018
Data is driving design for education
In gathering this constant flow of data and recognizing the shifting trends, how can educational institutions make informed choices and smart design decisions that lead to higher efficiency and improved control over capital budgets?
Architects | Jun 6, 2018
Chief of Staff of the Army honors SmithGroupJJR’s Philip Tobey with Outstanding Civilian Service Award
Tobey began his career as a captain and military architect at Headquarters, U.S. Air Force Office of the Surgeon General, with review responsibility for medical projects worldwide.
Architects | Jun 6, 2018
A modest boost in licensed architects in 2017
NCARB’s annual survey shows California and New York leading the pack.
Healthcare Facilities | Jun 6, 2018
French 'Alzheimer’s Village' designed to resemble a medieval bastide
The new facility will provide research on a new way of treating Alzheimer’s patients.
Architects | Jun 5, 2018
Michael Green Architecture joins Katerra
Michael green architecture is a globally recognized leader in mass timber architecture.
Architects | Jun 4, 2018
Changing the way we think about water and design
We have several gaps between the need and desire to have abundant, accessible, clean water and the reality of dealing with on-going and increasing water shortage crises.
Libraries | Jun 1, 2018
New library offers a one-stop shop for what society is craving: hands-on learning
Beyond lending books and DVDs, the Elkridge (Md.) branch library loans household tools like ladders, wheelbarrows, and sewing machines.