flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Structural concrete code revisions open for public comments

Structural concrete code revisions open for public comments

American Concrete Institute seeks input on 10-year code review project


May 8, 2014

The American Concrete Institute’s completely reorganized ACI 318-14, “Building Code Requirements for Structural Concrete and Commentary,” is open for public review for a 45-day period.

“Members of ACI Committee 318 have been actively working on this completely reorganized Code for over 10 years, and have collectively dedicated over 96,000 work hours to improve its usability and increase confidence among all Code users,” said Randall W. Poston, Ph.D., P.E., S.E., Chair, ACI Committee 318. “The committee encourages Code users and those interested in ACI 318 to visit the web portal at www.concrete.org/ACI318, download and review the complete draft of ACI 318-14, and provide the Institute with insight and comments for further improvements by June 17, 2014.”

ACI 318-14 has been reorganized for greater ease of use and to address design requirements for specific member types, such as beams, columns, walls, and diaphragms. All design provisions for a specific member type are contained within a single chapter. The committee also enhanced the readability of the document.

Many lengthy provisions were parsed into multiple shorter provisions addressing single requirements, and several provisions were defined using tables. The increased use of graphs and tables instead of text provides clearer presentation of the information. Code language was edited for consistent use of terms and symbols.

Significant highlights of the new ACI 318 include:

·         Improved language and style consistency

·         Improved logic and flow of information

·         Member-based organization to quickly locate relevant code information

·         Construction requirements centralized in one chapter

The 2014 edition of ACI 318-14 “Building Code Requirements for Structural Concrete” is expected to be available in fall 2014, and be referenced in the 2015 edition of the International Building Code.

(http://www.concrete.org/News/NewsDetail.aspx?f=51686960)

Related Stories

Codes and Standards | May 1, 2020

OSHA says most employers don’t have to track worker COVID-19 infections

Agency clarifies responsibility for contractors, others.

Codes and Standards | Apr 29, 2020

New York City tightens restrictions on construction during pandemic

Dept. of Buildings has issued more than 100 violations and stop-work orders.

Codes and Standards | Apr 28, 2020

ASHRAE, WELL panels to tackle revising standards to limit spread of viruses in buildings

Will examine ways to reduce infectious threats through building designs and operations.

Codes and Standards | Apr 24, 2020

Dept. of Labor issues guidance for respiratory protection during N95 shortage

Elastomeric respirators or powered, air-purifying respirators, and expired N95s are allowable alternatives

Codes and Standards | Apr 23, 2020

Group will create ecosystem for smart building data

Seven Finnish companies aim to integrate all technical systems into a single platform.

Codes and Standards | Apr 23, 2020

COVID-19 epidemic demonstrates value of flexible hospital space

Some rooms being repurposed for ICU care.

Codes and Standards | Apr 15, 2020

Embodied carbon footprint can be reduced by using conventional materials

High-SCM concrete, and cellulose and wood fiber insulation among the greener alternatives.

Coronavirus | Apr 13, 2020

COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open

Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online. 

Codes and Standards | Apr 13, 2020

Design competition focuses on reducing urban heat island effect

Cool Abu Dhabi aims to transform urban life in the Middle East.

Codes and Standards | Apr 13, 2020

What building science says about reducing COVID-19 transmission

Impact of temperature and relative humidity is unclear.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021