flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Strong industry growth could be slowed by skilled labor shortage, says Gilbane report

Strong industry growth could be slowed by skilled labor shortage, says Gilbane report

The industry has been losing workers for more than five years, falling to low points in the third quarters of both 2012 and 2013.


By Gilbane Building Report | September 4, 2014

Gilbane Building Company announced the Summer 2014 edition of its in-house economics report, Building for the Future — Construction Economics: Market Conditions in Construction. The report predicts rapid growth coupled with the lack of skilled, experienced labor and the ability to meet schedule will be some of the most important industry issues to address over the next few years.

“The good, if not, great news is that the most favorable, forward-looking conditions support expectations for strong industry growth in 2015,” said Ed Zarenski, a Gilbane estimating executive with more than 40 years in the construction business. “Very active markets will drive escalation to climb more rapidly than we have seen in six years.

“The challenge of anticipated workforce shortages will have a detrimental effect on labor cost, productivity, the ability to readily increase construction volume and the ability to complete projects on time," Zarenski added.

While construction spending for 2014 will finish the year 5.5% higher than 2013 and the unemployment rate in construction is down to 7.5%, the industry has been losing workers for more than five years, falling to low points in the third quarters of both 2012 and 2013.

Going forward, as the workload expands rapidly, the significant shortage of available skilled workers, as well as management-level personnel, will impact productivity and force extended work schedules. The report notes total construction spending will increase 7% for 2015, which is a good sign for future hiring, but highlights the need for workers to have the right training and skills.

Other report highlights include:

  • The workforce has never grown as fast as what will be needed to accommodate the rate of new construction growth predicted. Rapid workforce expansion leads to productivity losses.

  • Construction jobs are up 600,000, or 11% from the low point. However, new jobs plus added hours worked for the entire labor force shows total labor is up 18%.  That means 40% of the total gains in labor in the past three years is due to added hours, not new jobs. That is the equivalent of nearly 400,000 jobs.

  • The average annual rate of new nonresidential construction starts for the most recent four months is $197 billion. The average for the same four months one year ago was $146 billion.  It is expected to be higher in the next four months. This large increase in starts will result in a rapid increase in nonresidential buildings spending growth in the second half 2014 through 2015.

  • Residential construction will increase 12% in 2015, but non-building infrastructure will decrease 5%. Nonresidential buildings spending will grow 11%, led by commercial and office construction, both expected to be up 15% in 2015.

The report is available here.

Related Stories

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021