flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Strong industry growth could be slowed by skilled labor shortage, says Gilbane report

Strong industry growth could be slowed by skilled labor shortage, says Gilbane report

The industry has been losing workers for more than five years, falling to low points in the third quarters of both 2012 and 2013.


By Gilbane Building Report | September 4, 2014

Gilbane Building Company announced the Summer 2014 edition of its in-house economics report, Building for the Future — Construction Economics: Market Conditions in Construction. The report predicts rapid growth coupled with the lack of skilled, experienced labor and the ability to meet schedule will be some of the most important industry issues to address over the next few years.

“The good, if not, great news is that the most favorable, forward-looking conditions support expectations for strong industry growth in 2015,” said Ed Zarenski, a Gilbane estimating executive with more than 40 years in the construction business. “Very active markets will drive escalation to climb more rapidly than we have seen in six years.

“The challenge of anticipated workforce shortages will have a detrimental effect on labor cost, productivity, the ability to readily increase construction volume and the ability to complete projects on time," Zarenski added.

While construction spending for 2014 will finish the year 5.5% higher than 2013 and the unemployment rate in construction is down to 7.5%, the industry has been losing workers for more than five years, falling to low points in the third quarters of both 2012 and 2013.

Going forward, as the workload expands rapidly, the significant shortage of available skilled workers, as well as management-level personnel, will impact productivity and force extended work schedules. The report notes total construction spending will increase 7% for 2015, which is a good sign for future hiring, but highlights the need for workers to have the right training and skills.

Other report highlights include:

  • The workforce has never grown as fast as what will be needed to accommodate the rate of new construction growth predicted. Rapid workforce expansion leads to productivity losses.

  • Construction jobs are up 600,000, or 11% from the low point. However, new jobs plus added hours worked for the entire labor force shows total labor is up 18%.  That means 40% of the total gains in labor in the past three years is due to added hours, not new jobs. That is the equivalent of nearly 400,000 jobs.

  • The average annual rate of new nonresidential construction starts for the most recent four months is $197 billion. The average for the same four months one year ago was $146 billion.  It is expected to be higher in the next four months. This large increase in starts will result in a rapid increase in nonresidential buildings spending growth in the second half 2014 through 2015.

  • Residential construction will increase 12% in 2015, but non-building infrastructure will decrease 5%. Nonresidential buildings spending will grow 11%, led by commercial and office construction, both expected to be up 15% in 2015.

The report is available here.

Related Stories

| Mar 3, 2014

Negotiate your way to success

There are few business skills as important as negotiation. Many successful businesspeople pride themselves on their ability to turn a deal in their favor.  Here are a few key negotiation principles to ensure you’re generally getting a good deal.

| Mar 3, 2014

5 ways to gain clients you actually like

Gaining more clients is one thing. Gaining more clients that you actually like is something else entirely. Here are some tips to perfect the art of attracting and retaining clients that you enjoy working with. 

| Mar 3, 2014

Engineering and construction CEOs are cautiously optimistic about the global economy, says PwC

Firm leaders remain leery about the availability of skilled workers, the state of government debt and deficits, and rising material prices, according to PwC’s 2014 Global CEO Survey.

| Mar 1, 2014

Dramatic fractal roof highlights SOM's new Mumbai airport terminal [slideshow]

The terminal merges new technology and traditional regional architecture, notably in the fractal roof canopy that runs throughout the terminal. 

| Feb 28, 2014

Six finalists selected in design competition for Canadian Holocaust monument

David Adjaye and Daniel Libeskind are among the finalists for the National Holocaust Monument, planned near the Canadian War Museum in Ottawa.

| Feb 27, 2014

Gensler reveals 44 design trends for the next decade

The 82-page report covers dozens of emerging trends in healthcare, commercial office, hospitality, tall buildings, and more.

| Feb 27, 2014

Target converts former prison dump into latest big-box store

Target's new San Rafael, Calif., location was built on the site of the former San Quentin prison dump. 

| Feb 27, 2014

Open or private offices? It depends on the business plan

Open layouts are grabbing headlines as a hallmark of the new workplace—think the Google campus or Facebook's headquarters. And for smaller-scale operations, open designs are often lauded for being less expensive than private office plans. But does that mean all offices should have an open layout?

| Feb 27, 2014

3 reasons to apply computational fluid dynamics on your next project

From right-sizing mechanical systems to understanding the impact of design alternatives, CFD offers a host of benefits for the Building Team. 

| Feb 27, 2014

12 facts about heat-treated glass: Why stronger isn’t always better

Glass is heat-treated for two reasons: the first is to increase its strength to resist external stresses such as wind and snow loads, or thermal loads caused by the sun’s energy. The second is to temper glass so that it meets safety glazing requirements defined by applicable codes or federal standards. 

boombox1
boombox2
native1

More In Category

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021