flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stone Construction acquires Harden Constructors

Stone Construction acquires Harden Constructors


May 18, 2011

Houston, Texas -- Stone Construction LLC, a design-build construction firm focused on mid – large sized commercial construction projects for owner-occupied industrial facilities, has acquired Harden Constructors, Inc.  The two companies have merged their full-service project design and construction capabilities to assist owners of office, industrial, manufacturing, warehouse, retail, educational and religious facilities, and developers of such facilities in prime office parks.

“We are thrilled to add the expertise of Harden Constructors to our offerings. They too have specialized in custom, top quality projects and both of our companies share a long history of giving owners and developer’s single-source design and construction services,” said Chris Hotze, President of Stone Construction.  “Our focus is design-build projects where we are the single entity working to afford our clients maximum design and cost efficiencies.  Harden Constructors mirrored our approach and is well known for its personalized service and a full range of strengths in constructing more than 1.5 million square feet of commercial space.”

Stone Construction is one of the few companies to utilize computerized building information model (BIM) technology at the start of each project as the foundation of a pre-construction collaboration with clients, removing the guesswork by identifying problems early rather than at the jobsite.   As part of Stone’s Streamlined Structural Process™ (SSP), BIM allows for structural conflicts, aesthetic challenges, and mechanical interaction to be identified and resolved before construction, saving time and money for clients. Stone’s leading engineering, design, LEED-certified and BIM experts are adept at responding to customer requests and are able to evaluate needs and application of each unique situation.

“For over 20 years Harden Constructors has focused on building a team of specialists with experience in planning, design and construction, and by joining Stone Construction we will further leverage our capabilities,” added Harden Constructors President Garry Harden.  “Our specialties like concrete tilt-wall construction works in tandem with Stone Construction’s BIM design capabilities to deliver turnkey projects customized to individual clients.”

Both companies have undertaken commercial construction projects for a diverse client base including: Builders First Source, Daniel Industries, Dominican Sisters, Exxon, Fisher Scientific, Guaranty Bank, ITT, Kroger, LD Brinkman, Rice University, Siemens, Supa Doors, Inc., The U.S. Department of Energy, Triten Corporation, and W.R. Grace.

When combined with the 35-plus years of construction industry experience represented by Garry Harden and the Harden Constructors team, Stone Construction’s unique core competencies provide exceptional value in the Houston owner-occupied commercial and industrial construction market.

Related Stories

| Feb 14, 2012

Thornton Tomasetti names Al Hashimi vice president for its Middle East Operations

Al Hashimi is joining the company to help expand Thornton Tomasetti’s business in the region and support clients locally.

| Feb 13, 2012

WHR Architects renovation of Morristown Memorial Hospital Simon Level 5 awarded LEED Gold

Located in the Simon Building, which serves as the main entrance leading into the Morristown Memorial Hospital campus, the project comprises three patient room wings connected by a centralized nursing station and elevator lobby.

| Feb 13, 2012

Center for Sustainable Building Research launches CommercialWindows.org

Resource aims at reducing commercial operating costs and energy consumption.

| Feb 13, 2012

New medical city unveiled in Abu Dhabi

SOM’s design for the 838-bed, three-million-square foot complex creates a new standard for medical care in the region.

| Feb 10, 2012

Task force addresses questions regarding visually graded Southern Pine lumber

Answers address transition issues, how to obtain similar load-carrying capabilities, and why only some grades and sizes are affected at this time. 

| Feb 10, 2012

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Energy-efficiency program to improve 13 senior residential care facilities and save nearly $18 million.

| Feb 10, 2012

Besculides joins New York Office of Perkins Eastman as associate principal

Besculides joins with more than 17 years’ experience in design, business development, and account management for the government, healthcare, and corporate practice areas with a particular focus on the financial and media sectors.

| Feb 10, 2012

Mortenson Construction research identifies healthcare industry and facility design trends

The 2012 Mortenson Construction Healthcare Industry Study includes insights and perspectives regarding government program concerns, the importance of lean operations, flexible facility design, project delivery trends, improving patient experience, and evidence-based design. 

| Feb 10, 2012

LAX Central Utility Plant project tops out

Construction workers placed the final structural steel beam atop the Plant, which was designed with strict seismic criteria to help protect the facility and airport utilities during an earthquake.

| Feb 8, 2012

Nauset completes addition and renovation for Winchester senior living community

Theater, library, fitness center, and bistro enhance facility.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021