flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.


By Posted by Tim Gregorski, Senior Editor | May 9, 2012
Stoddert is one of 78 schools spanning 29 states to receive the recognition.
Stoddert is one of 78 schools spanning 29 states to receive the recognition.

The Washington, DC office of Perkins Eastman joined the students, faculty, staff, and community of Stoddert Elementary School; the Department of General Services; and DC Public Schools in celebrating the school’s recognition for environmental sustainability with a first-ever US Department of Education Green Ribbon School award. Stoddert is one of 78 schools spanning 29 states to receive the recognition.

Designed as both a high performance, healthy, and sustainable environment and as a teaching tool, Stoddert Elementary School and Community Center enhances learning and inspires environmental stewardship, as well as serving as an inspiration for the entire community. The school, certified LEED for Schools Gold, enhances learning by optimizing acoustics, enhancing indoor air quality, providing for thermal control/comfort, providing pervasive natural light, and by actively engaging the students and community in understanding how the design conserves resources. Stoddert is first school in the District of Columbia to be fully served by a ground source heating and cooling (geothermal) system.

An interactive kiosk with content also available online, enables Stoddert’s students to analyze the building’s use of energy, water, and other resources.  A student-led Energy Patrol guides tours of the building empowering students to teach what they have learned. +

Related Stories

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 24, 2012

Roofing Supply Group acquired by Clayton, Dubilier & Rice

RSG provides a complete offering of residential and commercial roofing materials and related supplies.

| Apr 24, 2012

McLennan named Ashoka Fellow

McLennan was recognized for his work on the Living Building Challenge.

| Apr 24, 2012

AECOM design and engineering team realizes NASA vision for Sustainability Base

LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.

| Apr 23, 2012

Vegas’ CityCenter called financial ‘black hole’

Two and a half years ago, stockholders filed six lawsuits after the stock price fell from $99.75 on Oct. 9, 2007, to $1.89 on March 5, 2009. Bondholders sued over similar steep losses.

| Apr 23, 2012

Innovative engineering behind BIG’s Vancouver Tower

Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.

| Apr 23, 2012

AAMA releases updated specification for anodized aluminum

AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.

| Apr 23, 2012

Thornton Tomasetti project wins AISC Merit Award

Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021