Sto Corp., a manufacturer of cladding, air barrier, coating, and restoration systems, has partnered with a new distributor in the Carolinas. Guaranteed Supply Company, led by Pete Lovell, EIFS (Exterior Insulation and Finish System) and stucco product manager, is the new distributor for Sto Corp.
“We are thrilled to have Guaranteed Supply Company as our new distributor for the Carolinas,” said Sto Sales Rep, Calvin Holloway. “With Guaranteed we will have coverage in several parts of North Carolina where we haven’t been before, from the mountains to the coast.”
Holloway is especially excited with Lovell leading the charge. Lovell has sold EIFS and stucco products for 30 years, with several different companies before joining Guaranteed to head up this endeavor. Lovell now has six representatives selling Sto’s EIFS and stucco systems exclusively, and Sto is sold at all 11 branches in North Carolina and South Carolina, as well as at the location in Norfolk, Va. +
Related Stories
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.