flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Steven R. Zirkel named president of Metl-Span

Building Team

Steven R. Zirkel named president of Metl-Span

20-year industry veteran takes over the reins of manufacturer of insulated metal panel products for the institutional, commercial, industrial and cold storage building markets.


October 28, 2015
Steven R. Zirkel, Metl-Span President

Steven R. Zirkel appointed President of Metl-Span, manufacturer of insulated metal panels based in Lewisville, Texas.

Metl-Span announced that Steven R. Zirkel has joined the company as the new president. Metl-Span is an industry leader in providing insulated metal panel products for increasing usage in institutional, commercial, industrial and cold storage markets.

“Metl-Span is the recognized industry leader and I’m looking forward to building on a heritage of customer focus and innovation to serve our customers and grow the demand of insulated metal panels.” Zirkel says. “Being a part of the NCI Building Systems family of companies, Metl-Span is well positioned to continue our leadership in institutional, commercial, industrial and cold storage markets.”
Zirkel comes to Metl-Span with more than 20 years of global leadership experience. Prior to joining Metl-Span, Zirkel was vice president of marketing, sales and commercial excellence at William Scotsman, leading strong customer focus and growth. Prior to that, Zirkel worked at Owens Corning as the director of market and business development, where he led strategy and growth plans for the rigid extruded polystyrene foam insulation business unit. Additionally, while at Owens Corning he was general manager of the global thermoplastics business and managing director of Asia Pacific. He has lived and worked on three continents and conducted business in more than 30 countries.
 
Metl-Span pioneered many of the developments of insulated metal panels and continues to make significant contributions to design innovations and technology that shape industry standards.  For more information on Metl-Span products, call 877-585-9969 or visit www.metlspan.com.
 
Public Relations Contact:
Amanda Storer, Brand Manager, Metl-Span
1720 Lakepointe Dr. Ste 101
Lewisville, TX 75057
(972) 353-6292

 

Related Stories

| Aug 11, 2010

New York Mayor Bloomberg opens nation's first multi-story green industrial facility and announces new green manufacturing plant at Brooklyn Navy Yard

Mayor Michael R. Bloomberg, Deputy Mayor for Economic Development Robert C. Lieber, and Brooklyn Navy Yard Development Corporation Chairman Alan Fishman and President Andrew H. Kimball today opened the Perry Avenue Building, the nation's first multi-story green industrial facility at the Brooklyn Navy Yard. Mayor Bloomberg also announced the creation of Duggal Greenhouse, a 60,000-square-foot LEED Platinum certified facility.

| Aug 11, 2010

ASHRAE introduces building energy label prototype

Most of us know the fuel efficiency of our cars, but what about our buildings? ASHRAE is working to change that, moving one step closer today to introducing its building energy labeling program with release of a prototype label at its 2009 Annual Conference in Louisville, Ky.

| Aug 11, 2010

Urban Land Institute honors five 'outstanding' developments in Europe, Middle East, and Africa

Five outstanding developments have been selected as winners of the Urban Land Institute (ULI) 2009 Awards for Excellence: Europe, Middle East, and Africa (EMEA) competition. This year, the competition also included the announcement of two special award winners. The Awards for Excellence competition is widely regarded as the land use industry’s most prestigious recognition program.

| Aug 11, 2010

Design firms slash IT spending in 2009

Over half of architecture, engineering, and environmental consulting firms (55%) are budgeting less for information technology in 2009 than they did in 2008, according to a new report from ZweigWhite. The 2009 Information Technology Survey reports that firms' 2009 IT budgets are a median of 3.3% of net service revenue, down from 3.6% in 2008. Firms planning to decrease spending are expected to do so by a median of 20%.

| Aug 11, 2010

USGBC considering LEED for Data Centers program

In a blog post this morning on Earth2Tech, Justin Moresco writes that the U.S. Green Building Council is giving strong consideration to developing a version of its LEED green building rating system for data centers.

| Aug 11, 2010

Cannon Design’s European-inspired Sparkling Hill Resort breaks ground

Cannon Design, a leading international architectural, engineering and planning firm, is pleased to announce that the firm’s Sparkling Hill Resort and Wellness Hotel in Vernon, BC, has broken ground.

| Aug 11, 2010

A glimmer of hope amid grim news as construction employment falls in most states, metro areas

The construction employment picture brightened slightly with 18 states adding construction jobs from April to May according to a new analysis of data released today by the Bureau of Labor Statistics (BLS).  However, construction employment overall continued to decline, noted Ken Simonson, the chief economist for the Associated General Contractors of America.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021