Baruch College and the Steven L. Newman Real Estate Institute, together with the CUNY Institute for Urban Systems Building Performance Lab, will host an inaugural day-long conference Thursday, June 21, 2012, to introduce Energy Asset Management, a compelling high-yield approach that views energy comprehensively, across an entire portfolio of buildings.
“The industry is ready for the next step,” said Jack S. Nyman, NREI’s director and host of the event. “Operational efforts to save energy in individual commercial buildings have become routine. Operations have to be viewed in their totality if true efficiencies and substantial cost-effectiveness are to be realized. This conference will show property owners, their managers, and real estate asset managers how.”
NREI research – supported by the U.S. Department of Energy [U.S. DOE] and the New York State Energy Research & Development Authority revealed that top-level real estate professionals have been ignored as the industry has pushed to get sustainability measures in place. “The focus was on the boiler room, but true yield comes at the boardroom level,” Mr. Nyman stated.
Topics at the conference, which will take place at Baruch College’s William and Anita Newman Conference Center, 151 East 25th Street, will address how to:
- Execute integrated retrofits to ensure long-term energy savings
- Implement energy performance assurance
- Identify the best emerging practices in O&M
- Create informative, useful financial models
- Navigate and interpret energy audits
- Satisfy ever-increasing regulatory compliance
- Train the green team
- Develop solutions to the split incentive
Conference funding reflects wide industry interest in Advanced Energy Performance, Energy Asset Management, and NREI’s leadership in sustainability training. The conference is registered with the American Institute of Architects, ASHRAE Continuing Education, and BOMI International, which will give attendees continuing education credits for participating.
Go to http://aepconference.com/ for more information. Registration begins at 8 a.m. The conference closes at 5 p.m. +
Related Stories
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 19, 2012
Mixed-use project redefines Midtown District in Plantation, Fla.
Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.
| Mar 16, 2012
Work on Oxnard, Calif. shopping center resumes after a three-year hiatus
Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall.
| Mar 16, 2012
Stego embarks on HPD Pilot Program
Vapor barrier manufacturer strives to provide better green choices to designers and builders.
| Mar 16, 2012
Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge
Architects in U.S. and abroad offered the chance to showcase their very best work.
| Mar 14, 2012
Hearing to decide fate of unfinished Harmon in Las Vegas under way
The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.
| Mar 14, 2012
Firestone names 2012 Master Contractor Award Winners
Annual award acknowledges industry’s top roofing professionals.
| Mar 14, 2012
Plans for San Francisco's tallest building revamped
The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.