Fifty years after the John F. Kennedy Center for the Performing Arts opened in Washington, D.C., construction work on a 65,000-sf expansion to the facility began.
Designed by Steven Holl and BNIM, the project is being funded privately, and will be located south of the current facility. Functioning as an interactive space where artists and the community can come together, it will include spaces for rehearsal and education, as well as multi-use indoor and outdoor areas.
The building is meant to fuse the Potomac River and the landscape, the architects said. A grove made up of 35 ginkgo trees will remind visitors that Kennedy was America's 35th president, and an infinity pool will give visitors a direct sightline to Theodore Roosevelt Island.
Of the connection between the local landscape and the expansion, Steven Holl said in a statement: "The varied gardens will provide opportunities for casual performances and events and other flexible locations for enhanced engagement. The Kennedy Center’s connection to the Potomac River will finally be achieved, more than 50 years after it was lost in Edward Durell Stone’s initial design, allowing easy access to and from the Rock Creek Trail and the Georgetown waterfront."
The expansion is slated for completion on May 29, 2017, which would have been Kennedy's 100th birthday.
Related Stories
| Jun 22, 2012
Golden Gate Bridge Celebrates 75 Years With the Opening of New Bridge Pavilion
With features such as Nichiha's Illumination series panels, super-insulating glass units, and LED lighting, the new Golden Gate Bridge Pavilion not only boasts the bridge's famous international orange, but green sustainability as well
| Jun 22, 2012
Revitalization Efforts Advance in Hackensack, N.J.
Work progresses on Cultural and Performing Arts Center and Atlantic Street Park
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 22, 2012
Casaccio Architects and GYA Architects join to form Casaccio Yu Architects
Architects Lee A. Casaccio, AIA, LEED AP, and George Yu, AIA, share leadership of the new firm.
| May 14, 2012
Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons
Supertall two-tower complex located in Seoul’s Yongsan International Business District.
| May 7, 2012
2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital
How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.
| May 3, 2012
U of Michigan team looking to create highly efficient building envelope designs
The system combines the use of sensors, novel construction materials, and utility control software in an effort to create technology capable of reducing a building’s carbon footprint.