The Museum of Fine Arts Houston’s redevelopment, budgeted for $450 million, is “buoyed by some of the largest donations in the city’s history,” the Houston Chronicle reported.
Two new buildings will be constructed, designed by Steven Holl Architects, to complement the existing structures. The new extension will be named the Fayez S. Sarofim Campus, after the Texas billionaire who donated $70 million for the project. Another hefty donation is the $50 million from the museum’s board chairman, Richard Kinder, and his wife, Nancy.
Holl designed the campus’ north side to be a pedestrian-centered cultural hub on a lively landscape with ample underground parking. One new structure planned, which the Chronicle dubbed the redevelopment’s “most prominent,” is the Nancy and Rich Kinder Building, a 164,000-sf, three-story structure shaped like a puzzle piece with a luminous canopy.
“It’s all about shaping space,” Holl told the Chronicle. “The collection of buildings there is already outstanding. It’s very delicate, not a site that calls for over-exuberance.”
More on the design at the Houston Chronicle.
Related Stories
| Apr 8, 2014
Understanding value billing vs. conventional billing
Every company is a sum of the value it delivers to its clients. What differs from one company to the next is how that value is delivered and perceived. All too often, it is based solely on the fee you charge.
| Apr 8, 2014
Science, engineering find common ground on the Northeastern University campus [slideshow]
The new Interdisciplinary Science and Engineering Building is designed to maximize potential of serendipitous meetings between researchers.
| Apr 8, 2014
40 Under 40 winners: Meet the contractors
Of the up-and-coming AEC professionals to be named to the class of 2014, nine make their living as contractors.
| Apr 7, 2014
40 Under 40 winners: Meet the architects
Of the up-and-coming AEC professionals to be named 40 Under 40 winners by the editors of Building Design+Construction, 21 make their living in the architecture profession.
| Apr 4, 2014
$25 million Orion Jet Center designed by SchenkelShultz now open
As the centerpiece of the 45-acre campus, which is its first phase of a planned 215-acre mixed-use development, the 18,000 square foot executive terminal facility offers spacious passenger areas, administrative space, an executive suite, rental car kiosk, catering and a cafe.
| Apr 3, 2014
Security, accountability, and cloud access: Can you really have it all?
I’ve heard countless stories of conversations between project engineers and IT professionals who can’t come to an agreement on the level of security needed to protect their data while making it more accessible—not only externally, but also internally.
| Apr 2, 2014
The new model of healthcare facility management
A growing number of healthcare organizations are moving to an integrated real estate model in an effort to better manage costs, respond to regulatory requirements, and support changes in patient care delivery.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Apr 2, 2014
Check out the stunning research facility just named 2014 Lab of the Year [slideshow]
NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards.
| Apr 1, 2014
The risks of mismatched fire-rated assemblies
Mismatched fire-rated glass and framing happens more often than you think. Failing to confirm that the tested and listed performance capabilities of the framing system match those of the glazing can create a financial nightmare for the entire building team.