A new 1,300-seat concert hall is set for construction in Ostrava, Czech Republic. Steven Holl Architects and Architecture Acts won an international competition to design the project.
The building was designed as a “perfect acoustic instrument in its case,” according to the architects. A smooth case of zinc cladding holds an “instrument” in an extended vineyard-type plan made of concrete and maple wood. The hall is positioned facing an existing park at the building’s rear in order to shield urban traffic noise. A new entrance on the promenade rises over the top of the existing historical Cultural Center in a sky-lit lobby for the new hall.
Inside, Leoš Janáček’s theories of time will guide and organize the concert hall’s interior geometry. Acoustic panels are organized according to scasovani, or rhythm, in three variants: Znici = sounding, Scitaci = counting, Scelovac = summing.
See Also: BIG’s MÉCA combines three regional art agencies into one loop
The Ostrava Concert Hall will provide performance space for the Janáček Philharmonic Orchestra. It is slated for completion in 2023.
Related Stories
| Mar 7, 2012
LEO A DALY selected to design Minnesota Fallen Firefighters Memorial
The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.
| Feb 15, 2012
Englewood Construction announces new projects with Destination Maternity, American Girl
Englewood’s newest project for Wisconsin-based doll retailer American Girl, the company will combine four vacant storefronts into one large 15,000 square-foot retail space for American Girl.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Jan 31, 2012
Fusion Facilities: 8 reasons to consolidate multiple functions under one roof
‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series on the design and construction of university facilities.
| Jan 24, 2012
U of M installs new lighting at Crisler Player Development Center
Energy efficient lighting installed at PDC reduce costs and improves player performance.
| Jan 6, 2012
New Walgreen's represents an architectural departure
The structure's exterior is a major departure from the corporate image of a traditional Walgreens design.
| Dec 7, 2011
ICS Builders and BKSK Architects complete St. Hilda’s House in Manhattan
The facility's design highlights the inherent link between environmental consciousness and religious reverence.
| Dec 5, 2011
SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando
The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.
| Nov 29, 2011
SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China
Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.