flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sterling Bay pulled on board for Chicago Old Main Post Office project

Sterling Bay pulled on board for Chicago Old Main Post Office project

The development not only plans to restore the existing, historical structure, but will also enhance the area around it.


By BD+C Staff | June 20, 2014
Photo courtesy of Wikimedia Commons
Photo courtesy of Wikimedia Commons

It looks like the historic yet long neglected Old Main Post Office in Chicago will get a face-lift pretty soon.

British investor Bill Davies of International Property Developers North America (IPD) has partnered up with Chicago-based Sterling Bay Cos. on a $500 million first-phase project, the Chicago Sun-Times reports.

The plan is to convert the historic building into a 2.7 million-sf, high-end mixed-use center.

IPD not only plans to restore the neoclassical post office exteriors and interiors to their original splendor, but also hopes to extend new retail and entertainment floors next to the historic structure on the Chicago River’s edge.

The Old Post Office’s restoration won’t just be for future tenants; the area below is being planned as a transportation hub for the city, and the main lobby as a public entryway for pedestrians.

Related Stories

| Dec 10, 2011

Energy performance starts at the building envelope

Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.

| Dec 10, 2011

Turning Balconies Outside In

Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures. 

| Dec 10, 2011

BIM tools to make your project easier to manage

Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.

| Dec 9, 2011

BEST AEC FIRM 2011: MHTN Architects

Serving Utah for nearly eight decades.

| Dec 9, 2011

BEST AEC FIRM 2011: HMC Architects

Fostering a tradition of collaboration.

| Dec 9, 2011

BEST AEC FIRM 2011: Gensler

Developing talent on a global scale.

| Dec 9, 2011

BEST AEC FIRM 2011: Chapman Construction/Design

Taking sustainable practices to heart.

| Dec 9, 2011

BEST AEC FIRMS 2011: EYP Architecture & Engineering

Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.

| Dec 8, 2011

Keast & Hood Co. part of Statue of Liberty renovation team

Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021