Stephen Ayers, FAIA, Architect of the Capitol, has been selected as the 2018 recipient of the Thomas Jefferson Award for Public Architecture. The Thomas Jefferson Award for Public Architecture recognizes architects in the public and private sectors, public officials, or other individuals who design distinguished public facilities and/or who advocate for design excellence. Ayers will be honored at the AIA Conference on Architecture 2018 in New York City.
As the 11th Architect of the Capitol, a position he was appointed to by President Barack Obama in 2010, Ayers cares for the nation’s architectural treasures and uses his prominent voice to advance the profession. His leadership has seen him testify before Congress on more than 50 occasions, where his keen insight on matters of historic preservation, long-range master planning, and sustainability has elevated the discourse on good design to the national level.
A recognized leader in sustainability, Ayers guides more than 2,300 employees and a $600 million budget in the stewardship of some of America’s most important buildings. He oversaw completion of the U.S. Capitol Visitor Center, a project that was well over budget and behind schedule when he was appointed. When he committed to a completion date and final budget — both of which proved to be accurate — Ayers demonstrated to Congress that the country’s architects can lead and deliver. More recently, his restoration of the Capitol dome and rotunda repaired more than 1,000 cracks and deficiencies in the structure.
Ayers has received several design awards from the AIA for his restorations of the Thomas Jefferson Building and U.S. Botanic Garden Conservatory, among others, and initiated and oversaw a comprehensive master plan for the U.S. Capitol complex. The plan was developed concurrently with one for the National Mall, and encompassed the House of Representatives, Senate, Library of Congress, and Supreme Court. His widely recognized sustainability initiative for the Capitol Complex has resulted in a 30 percent reduction in energy consumption across the campus, with a further 20 percent reduction on the horizon. As the voice of the profession at the highest levels of government, Ayers’ commitment to the past and concern for the future enhance projects nationwide.
Learn more about Ayers here: https://www.aia.org/showcases/173916-stephen-ayers-faia
The jury for the 2018 Thomas Jefferson Award includes: Rik Master, FAIA (Chair), USG Corporation; Patrick Burke, FAIA, Columbia University; Lindsey Graff, Assoc. AIA, Ayers Saint Gross Architects; Libby Haslam, AIA, GSBS Architects; and R. Steven Lewis, FAIA, TRC Energy Services.
Related Stories
| Nov 14, 2011
VanSumeren appointed to Traco general manager
VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco.
| Nov 11, 2011
By the Numbers
What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 11, 2011
AIA: Engineered Brick + Masonry for Commercial Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Nov 11, 2011
How Your Firm Can Win Federal + Military Projects
The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.
| Nov 10, 2011
BD+C's 28th Annual Reconstruction Awards
A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.
| Nov 10, 2011
Grousbeck Center for Students & Technology opens doors
New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.
| Nov 10, 2011
Skanska Moss to expand and renovate Greenville-Spartanburg International Airport
The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.