Stephen Ayers, FAIA, Architect of the Capitol, has been selected as the 2018 recipient of the Thomas Jefferson Award for Public Architecture. The Thomas Jefferson Award for Public Architecture recognizes architects in the public and private sectors, public officials, or other individuals who design distinguished public facilities and/or who advocate for design excellence. Ayers will be honored at the AIA Conference on Architecture 2018 in New York City.
As the 11th Architect of the Capitol, a position he was appointed to by President Barack Obama in 2010, Ayers cares for the nation’s architectural treasures and uses his prominent voice to advance the profession. His leadership has seen him testify before Congress on more than 50 occasions, where his keen insight on matters of historic preservation, long-range master planning, and sustainability has elevated the discourse on good design to the national level.
A recognized leader in sustainability, Ayers guides more than 2,300 employees and a $600 million budget in the stewardship of some of America’s most important buildings. He oversaw completion of the U.S. Capitol Visitor Center, a project that was well over budget and behind schedule when he was appointed. When he committed to a completion date and final budget — both of which proved to be accurate — Ayers demonstrated to Congress that the country’s architects can lead and deliver. More recently, his restoration of the Capitol dome and rotunda repaired more than 1,000 cracks and deficiencies in the structure.
Ayers has received several design awards from the AIA for his restorations of the Thomas Jefferson Building and U.S. Botanic Garden Conservatory, among others, and initiated and oversaw a comprehensive master plan for the U.S. Capitol complex. The plan was developed concurrently with one for the National Mall, and encompassed the House of Representatives, Senate, Library of Congress, and Supreme Court. His widely recognized sustainability initiative for the Capitol Complex has resulted in a 30 percent reduction in energy consumption across the campus, with a further 20 percent reduction on the horizon. As the voice of the profession at the highest levels of government, Ayers’ commitment to the past and concern for the future enhance projects nationwide.
Learn more about Ayers here: https://www.aia.org/showcases/173916-stephen-ayers-faia
The jury for the 2018 Thomas Jefferson Award includes: Rik Master, FAIA (Chair), USG Corporation; Patrick Burke, FAIA, Columbia University; Lindsey Graff, Assoc. AIA, Ayers Saint Gross Architects; Libby Haslam, AIA, GSBS Architects; and R. Steven Lewis, FAIA, TRC Energy Services.
Related Stories
| Dec 29, 2014
Hard hat equipped with smartglass technology could enhance job site management [BD+C's 2014 Great Solutions Report]
Smart Helmet is equipped with an array of cameras that provides 360-degree vision through its glass visor, even in low light. It was named a 2014 Great Solution by the editors of Building Design+Construction.
| Dec 29, 2014
Clayco lends operational support and financing to construction services startups [BD+C's 2014 Great Solutions Report]
Design-build firm Clayco has launched an investment arm called Treehouse Adventures to provide financing and operational infrastructure to startups, including those serving the AEC industry. The new venture was named a 2014 Great Solution by the editors of Building Design+Construction.
| Dec 29, 2014
Reef Worlds to build world’s largest underwater theme park for luxury resort [BD+C's 2014 Great Solutions Report]
Dubai is known for its gargantuan commercial building projects. The latest to be proposed is the world’s largest underwater theme park, designed and built by Reef Worlds. The project was named a 2014 Great Solution by the editors of Building Design+Construction.
| Dec 29, 2014
New data-gathering tool for retail designers [BD+C's 2014 Great Solutions Report]
Beacon technology personalizes smartphone messaging, creating a new information resource for store designers. It was named a 2014 Great Solution by the editors of Building Design+Construction.
| Dec 29, 2014
Leo A Daly's minimally invasive approach to remote field site design [BD+C's 2014 Great Solutions Report]
For the past six years, Leo A Daly has been designing sites for remote field stations with near-zero ecological disturbance. The firm's environmentally delicate work was named a 2014 Great Solution by the editors of Building Design+Construction.
| Dec 29, 2014
Wearable job site management system allows contractors to handle deficiencies with subtle hand and finger gestures [BD+C's 2014 Great Solutions Report]
Technology combines a smartglass visual device with a motion-sensing armband to simplify field management work. The innovation was named a 2014 Great Solution by the editors of Building Design+Construction.
| Dec 29, 2014
From Ag waste to organic brick: Corn stalks reused to make construction materials [BD+C's 2014 Great Solutions Report]
Ecovative Design applies its cradle-to-cradle process to produce 10,000 organic bricks used to build a three-tower structure in Long Island City, N.Y. The demonstration project was named a 2014 Great Solution by the editors of Building Design+Construction.
| Dec 29, 2014
14 great solutions for the commercial construction market
Ideas are cheap. Solutions are what count. The latest installment in BD+C's Great Solutions series presents 14 ways AEC professionals, entrepreneurs, and other clever folk have overcome what seemed to be insoluble problems—from how to make bricks out of agricultural waste, to a new way to keep hospitals running clean during construction.
| Dec 29, 2014
HealthSpot station merges personalized healthcare with videoconferencing [BD+C's 2014 Great Solutions Report]
The HealthSpot station is an 8x5-foot, ADA-compliant mobile kiosk that lets patients access a network of board-certified physicians through interactive videoconferencing and medical devices. It was named a 2014 Great Solution by the editors of Building Design+Construction.
| Dec 28, 2014
Robots, drones, and printed buildings: The promise of automated construction
Building Teams across the globe are employing advanced robotics to simplify what is inherently a complex, messy process—construction.