flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stellar wins four ABC Excellence In Construction awards

Stellar wins four ABC Excellence In Construction awards

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.


By Posted by Tim Gregorski, Senior Editor | August 21, 2012
Dwyn Taylor (eft), Vice President of Stellar, accepts an award at the ABC ceremo
Dwyn Taylor (eft), Vice President of Stellar, accepts an award at the ABC ceremony.

Stellar, an architecture, engineering, construction and mechanical services firm, has won four Excellence in Construction awards from the Florida First Coast Chapter of the Associated Builders and Contractors (ABC).

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories. Evaluation criteria include personnel management, quality control, scheduling, value analysis, obstacles overcome in the course of the project, and more.

Winners were recognized August 10 at an awards celebration at the Omni Hotel Jacksonville on the Riverwalk. All four of Stellar’s nominations won awards. The winning projects are:
 
Joint Base Myer-Henderson Hall
Stellar completed design and construction of the 65,000-sf addition and renovation to the Marine Corps Exchange (MCX) at Joint Base Myer-Henderson Hall in Alexandria, Virginia. The MCX, a general merchandise retail store, remained open for business throughout construction. Extensive subsurface foundations and underpinning for existing structures immediately adjacent to the project further challenged the construction sequencing. Stellar began work in April 2010 and completed the project October 2011.
 
Leilehua Golf Course
Serving as design-builder, Stellar renovated Leilehua Golf Course, a military-owned public course on the Hawaiian Island of Oahu. The project brought the nearly 70-year-old course up to United States Golf Association standards. The course is now being hailed as one of the military’s top courses worldwide. Construction began January 2011 and was complete March 2012.
 
St. Mark’s Episcopal Church and Day School

Stellar provided pre-construction and construction management services for the renovation and expansion of St. Mark’s Episcopal Church and Day School. The project united the school campus and church campus, previously divided by Oxford Avenue, and included creation of a new campus green; addition and renovation of the 1968 vintage chapel; a new 10,000-sf commons building; and 7,400-sf of new covered walkways and a drop-off pavilion. Construction began June 2011 and was complete May 2012.
 
Warrior Zone
Stellar provided architectural, engineering and construction services for a state-of-the-art recreational center called the Warrior Zone, located at Joint Base Lewis-McChord near Tacoma, Washington. Construction began on the 29,000-sf building in September 2010 and was complete October 2011. Stellar worked with the military’s Morale, Welfare, & Recreation branch to help develop the concept for this high-tech facility. In additional to a theatre, restaurant, and billiards, entertainment includes online games played individually or remotely with others using Alienware computers. +

Related Stories

| Sep 30, 2022

Lab-grown bricks offer potential low-carbon building material

A team of students at the University of Waterloo in Canada have developed a process to grow bricks using bacteria.

| Sep 29, 2022

FitzGerald establishes Denver office

The new location bolsters FitzGerald’s nationwide reach and capitalizes on local expertise and boots-on-the-ground to serve new and existing clients seeking to do business in Denver and the Front Range, as well as the Southwest United States, California, and Texas.

| Sep 28, 2022

New digital platform to foster construction supply chains free of forced labor

Design for Freedom by Grace Farms and the U.S. Coalition on Sustainability formed a partnership to advance shared goals regarding sustainable and ethical building material supply chains that are free of forced labor.

| Sep 27, 2022

New Buildings Institute released the Existing Building Decarbonization Code

New Buildings Institute (NBI) has released the Existing Building Decarbonization Code.

| Sep 23, 2022

High projected demand for new housing prompts debate on best climate-friendly materials

The number of people living in cities could increase to 80% of the total population by 2100. That could require more new construction between now and 2050 than all the construction done since the start of the industrial revolution.

| Sep 23, 2022

Central offices making a comeback after pandemic

In the early stages of the Covid pandemic, commercial real estate industry experts predicted that businesses would increasingly move toward a hub-and-spoke office model.

| Sep 22, 2022

Gainesville, Fla., ordinance requires Home Energy Score during rental inspections

The city of Gainesville, Florida was recently recognized by the U.S. Dept. of Energy for an adopted ordinance that requires rental housing to receive a Home Energy Score during rental inspections.

| Sep 21, 2022

New California law creates incentive for installing outdoor dining safety barriers

A new California law provides an incentive for commercial property owners to install barriers to protect outdoor diners.

| Sep 21, 2022

Demand for design services accelerates

Demand for design services from U.S. architecture firms grew at an accelerated pace in August, according to a new report today from The American Institute of Architects (AIA).

K-12 Schools | Sep 21, 2022

Architecture that invites everyone to dance

If “diversity” is being invited to the party in education facilities, “inclusivity” is being asked to dance, writes Emily Pierson-Brown, People Culture Manager with Perkins Eastman.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021