flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Steel-timber composite system proposed for mid- and high-rise buildings

Codes and Standards

Steel-timber composite system proposed for mid- and high-rise buildings

Structural steel columns and beams support a cross-laminated timber floor system.


By Peter Fabris, Contributing Editor | December 11, 2017

A new report and a video presentation support the concept of a steel and timber composite system for mid- and high-rise buildings.

The American Institute of Steel Construction (AISC) and Skidmore, Owings & Merrill LLP (SOM) recently released the report which proposes a system consisting of structural steel columns and beams that support a Cross-Laminated Timber (CLT) floor system, creating a flat soffit condition. AISC and SOM partnered to study the combination of steel and CLT with an eye toward residential construction.

“AISC and SOM’s study successfully shows that the comparative steel-timber composite construction system could also be competitive in the high-rise residential market,” according to a news release. The steel and timber framing system builds on SOM’s Timber Tower Research Project that studied timber-concrete composite construction for a hypothetical high-rise building.

The report, “AISC Steel and Timber Research for High Rise Residential Buildings - Final Report,” and a video presentation by Benton Johnson, PE, SE, LEED Green Associate, senior structural engineer at SOM, titled, “Your Next Project Considering Steel & Timber Research for Residential Buildings,” are available for free at www.aisc.org/timberresearch.

Related Stories

Codes and Standards | Jan 29, 2019

Registration now open for LEED v4.1 for New Construction and Interior Spaces

Emphasizes human health and integrative building design.

Codes and Standards | Jan 25, 2019

AEC professionals should push for net zero projects

Educate and lead clients to more sustainable choices, says LEED fellow.

Codes and Standards | Jan 24, 2019

OSHA unaffected by federal government shutdown

Agency fully funded for first nine months of 2019.

Codes and Standards | Jan 23, 2019

Hackers can easily take control of construction cranes

Potential for serious harm is real, say researchers.

Codes and Standards | Jan 22, 2019

Initiative will introduce open-source software for commercial and public building retrofits

Energy analysis tool will identify energy efficiency opportunities.

Codes and Standards | Jan 18, 2019

Texas city sues developer over changes in $1 billion mixed-use project

Revised plan eliminated 8-acre lagoon, trolley, show fountain, and reduced retail space.

Codes and Standards | Jan 17, 2019

First resilience benchmarks for U.S. communities released

Provides way to evaluate current state of resilience and guidance for areas of improvement.

Codes and Standards | Jan 16, 2019

California mass timber building competition kicks off January 15

Competition will award $500,000 in grants to teams who design innovative buildings.

Codes and Standards | Jan 15, 2019

Hazard mitigation provisions in codes save lives and protect property

New NIBS study finds that adopting 2018 Intl. Codes generate $11 benefit for every $1 invested.

Codes and Standards | Jan 10, 2019

Ontario building first to achieve zero-carbon designation by Canada GBC

Geothermal heating, living wall among notable features.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021