flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stantec expands into water infrastructure with acquisition of MWH Global

Engineers

Stantec expands into water infrastructure with acquisition of MWH Global

The combination would boost Stantec’s revenue by nearly 60% and its workforce by 45%.


By John Caulfield, Senior Editor | March 31, 2016

The multibillion-dollar expansion of the Panama Canal, which is scheduled to open in June, is one of the major water resource infrastructure projects that MWH Global has tackled. In acquiring this company, Stantec foresees significant cross-selling opportunities for its divisions. Image: MWH Global

The engineering giant Stantec is looking to gain a global foothold in water resources infrastructure through its definitive agreement to acquire MWH Global, a Broomfield, Colo.-based engineering, consulting, and construction management firm.

This is the biggest deal in Stantec’s 62-year history, according to the Edmonton Journal. Stantec confirms to BD+C that, if consummated, the acquisition would boost its annual revenue by 56% to 4.5 billion Canadian dollars (the equivalent of US$3.47 billion).

With 6,800 employees and 187 offices in 26 countries, MWH would also give Stantec a bigger presence in key markets that include the United Kingdom, Australia, New Zealand, South and Central America, and the Middle East. With this merger, Stantec—which is based in Edmonton, Alberta—would be generating 70% of its annual revenue from outside of Canada.

“It’s really a step into another era for us,” Bob Gomes, Stantec’s CEO, told the Journal. “But I don’t want to call it transformational because that sounds risky and it sounds like it’s lucky or it just happened. This is a firm we’ve known for a number of years.”

In this agreement, which both companies’ boards have signed off on, Stantec is paying cash for MWH’s stock. After taking into account assumed debt (estimated to equal 9.5 times MWH’s adjusted cash flow for 2015), the value of this deal is expected to be around US$795 million.

Stantec is financing the merger with equity financing—which includes a C$525 million public offering of 17.36 million subscription receipts priced at C$30.25 each—along with its C$800 million revolving credit facility, and C$450 million in non-revolving debt. CIBC World Markets and RBC Dominion Securities are underwriting the equity offer.

(Acquiring companies sometimes prefer offering subscription receipts—which automatically entitle the holder to receive the equivalent security of the buyer once the acquisition closes—to ensure they have the cash needed to complete the deal in advance of closing.)

Through synergies that would include leveraging its existing back-office functions, Stantec expects the merger produce savings of about $25 million annually by 2017. Neither company provided cost-saving details.

 

Stantec's growth strategy under CEO Bob Gomes is to expand its global footprint and diversity its services platforms. Image: Edmonton Journal

 

Stantec, which before this agreement had more than 15,000 employees in over 250 locations worldwide, says the rationale for this acquisition revolves around a growth strategy that positions the company to expand its geographic footprint beyond North America and to diversify its services platform.

MWH has worked on some of the more technically complex water and natural resource projects in the world, including the Panama Canal Third Set of Locks project. Hydroworld.com notes that MWH has been involved as well in the development and rehabilitation of numerous hydroelectric projects worldwide, such as Pakistan’s 102-MW Gulpur and 4,500-MW Diamer Bhasha dams, Malaysia’s 1,400-MW Baleh, and Argentina’s 1,890-MW Salto Grande.

Stantec expects this combination to build on MWH’s position as a prominent design firm within the global water market.

“The Engineering and Technical Services offered by MWH to the Energy and Industry sector are expected to add global capabilities in water-related design services to Stantec’s key hydro-power, oil and gas, mining, and industrial clients,” the company said in its prepared statement about the acquisition.

Stantec went on to speculate that MWH’s global client portfolio should generate cross-selling opportunities for Stantec’s Energy & Resources and Buildings & Environmental Services businesses.

Members of MWH’s management team, including presidents of key business units, will be joining Stantec after the acquisition closes. MWH’s chairman and CEO Alan Krause, and its CFO David Barnes, are also joining Stantec, although their roles and titles have not been announced publicly yet.

Barnes told the Boulder (Colo.) Daily Camera that MWH had spent much of the past year evaluating its capital structure and its ability to grow as an employee-owned firm. From that analysis, he said that MWHs managers concluded that merging with a larger, publicly traded entity would give it access to much-needed capital.

This deal still must be approved by at least two-thirds of MWH’s shareholders, who will vote on it in April. The acquisition also requires government approval. If all goes as planned the acquisition should be completed by the second quarter of this year. 

Tags

Related Stories

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021