flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stantec consolidates three Portland-area offices into one downtown location

Office Buildings

Stantec consolidates three Portland-area offices into one downtown location

Stantec worked with Ankrom-Moisan Architects on the design.


By David Malone, Associate Editor | October 25, 2018
Stantec conference room

Courtesy Stantec

Employees from Stantec’s water, building engineering and technology, power, environmental services, and waterpower and dams sectors are moving from three separate Portland-area offices to one 20,000-sf space in Moda Tower, Portland’s 10th largest office building.

Located in the heart of the city’s Business District, the 14th-floor office space has room for 115 employees and the ability to accommodate future growth. The office includes two non-formal conference spaces; four collaborative spaces for employees to use as breakout rooms, lounges, and communication hubs; four glass-walled conference rooms; glass-encased privacy booths for conference and telephone calls; a 1,050-sf breakroom; and a wellness room.

 

Stantec officeCourtesy Stantec.

See Also: USGBC survey suggests employees are happier, healthier, and more productive in LEED green buildings

 

The  breakroom features a 34-foot-long living wall and a 15-foot “conversion island” that can be used as a casual meeting space. The wellness room was designed without windows to provide a space for brief naps, nursing mothers, or just to grab some alone time.

Lease Crutcher Lewis built the new space.

 

Stantec kitchenCourtesy Stantec.

 

Stantec conference roomCourtesy Stantec.

Related Stories

Office Buildings | Feb 20, 2018

New Tommy Bahama HQ looks to ‘Make Life One Long Weekend’ for its employees

Approximately 400 employees will occupy the SkB Architects-designed space.

Office Buildings | Feb 13, 2018

Office market vacancy rate at 10-year low

Cautious development and healthy absorption across major markets contributed to the decline in vacancy, according to a new Transwestern report.

Office Buildings | Feb 8, 2018

Custom home or corporate office? Investment firm wanted both

Designed by Vertical Arts Architecture, the building features design elements found in high-end custom homes in the region.

Office Buildings | Feb 8, 2018

The American Psychiatric Association moves into The Wharf

The new office occupies 3 floors at 800 Main Avenue SW.

Wood | Feb 5, 2018

The largest timber office building in the U.S. will anchor Newark, N.J. mixed-use development

Michael Green Architecture is designing the building.

Green | Jan 30, 2018

Welcome to the Jungle: Amazon’s Spheres have opened to employees and the public

The Spheres provide the most unique aspect of Amazon’s downtown Seattle headquarters.

Office Buildings | Jan 18, 2018

At the ready: spec suites make hard-to-rent office space more attractive

Filling a need for startups looking for quick move-ins.

boombox1
boombox2
native1

More In Category

Office Buildings

Unlocking Sustainability: Smart Access in the Coworking Space

Smart building technologies, including modern access control systems, are transforming coworking spaces by advancing sustainability initiatives and offering new ways to create and operate efficient working spaces. Learn more about the benefits of eco-friendly practices, from reducing carbon emissions to cutting operating costs, and discover 
how choosing the right partners can amplify your green efforts.


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021