flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stantec agrees to acquire VOA Associates

Architects

Stantec agrees to acquire VOA Associates

This deal reflects an industry where consolidation is a strategic necessity for more firms.


By John Caulfield, Senior Editor | February 11, 2016

One of VOA Associates' strengths is the cultural and entertainment sector, and its recent work includes the renovation and expansion of the Museum of Arts and Sciences in Daytona, Fla., pictured above. Merging its operations with Stantec brings together companies with “a commitment to design,” says VOA's Chairman Mike Toolis. Image: VOA Associates

Stantec, one of the industry’s largest architecture/engineering firms, has signed a letter of intent to acquire Chicago-based VOA Associates, a top-10 architectural firm with eight offices and 280 employees in the U.S., Brazil, and China.

Based in Edmonton, Alberta, Stantec operates from over 250 offices worldwide. Its 15,000 employees include 3,800 who work in its building design practice, which the acquisition of VOA is expected to bolster.

“VOA strengthens our collective ability to grow our building practice in U.S. markets,” said Bob Gomes, PE, Stantec’s President and CEO. “Their talented staff has produced an impressive portfolio of workplace, healing, leisure, learning, civic, and entertainment venues.”

Stantec is acquiring VOA’s stock, but it did not disclose the terms of the agreement. If the parties complete this deal in late March, as planned, it would be Stantec’s 13th acquisition since January 2014. Recent transactions include its July 2015 purchase of certain assets and liabilities of VI Engineering, a 30-person firm, and the August 2015 acquisition of Irvine, Calif.-based, 60-person VA Consulting, a community development, transportation, and water-engineering firm.

In its financial report for the quarter ended September 30, 2015, Stantec reiterated its goal to be a top-10 global design firm, and to grow its business at a compound average rate of 15% per year. Through the first nine months of 2015, Stantec’s gross revenue increased by 15.1% to 2.167 billion Canadian dollars (US$1.55 billion), and its net income rose by 3.7% to C$131.1 million.

“Joining Stantec expands horizons and opportunities for our staff and clients,” says Michael Toolis, AIA, LEED AP, VOA’s Chairman and CEO. “Both firms share a commitment to design, a global growth strategy, and market diversity.”

Stanis Smith, SVP with Stantec, tells BD+C that VOA’s leadership “will absolutely” stay on post merger. Stantec’s operations are divided into four groups, and VOA will be folded into its Buildings Group, whose management structure will be altered to accommodate this integration.  

Smith says the two firms had been discussing this merger for several months. “What we saw is a complimentary fit, with no redundancies. It’s a marriage that make sense in both directions.” Smith adds that during those talks, Stantec and VOA officials identified a number of project opportunities that they could pursue jointly.

Smith says Stantec looks at acquisitions “as a way of getting better, not just bigger. Growth is not the design, but the outcome. You wouldn’t believe the number of inquiries we get, but we’re very selective in our acquisitions, where we’re looking for complimentary skills, geographies, or both.”

Toolis tells BD+C that VOA had considered private equity and international AEC firms as possible suitors. By choosing to join forces with Stantec, VOA “is ready to take another step” by “gaining access to [Stantec’s] size, portfolio, and talent.”

Toolis notes, too, that by acquiring VOA, Stantec will be doubling the size of its New York office, and significantly increasing its presence in Chicago, where VOA employs 140 people and Stantec 50. VOA is active in Orlando, where Stantec didn’t have an office, and is big in the entertainment and defense sectors, which hadn’t been as prominent for Stantec.

“We filled some gaps, and they strengthened our bench,” says Toolis.

The Stantec-VOA agreement comes at a time when consolidation (or rumblings about potential deals) within the AEC industry appears to be gaining momentum. Earlier this month, for example, London-based GB Fitzsimon, a cost and project consultant, announced it would merge with Cumming, a Los Angeles-based international project management and construction services firm.

A survey conducted last year by Zweig Group found that 42% of the architecture and planning firms polled were considering acquisitions, compared to 30% in 2012; and that 68% of the firms polled include a merger or acquisition in their strategic plans for the next five years.

VOA has been in business 46 years and is currently a decent-sized company—it generated more than $70 million in architecture revenue in 2014. But Toolis says his firm acknowledged that size matters at this moment in its history.

“Before the Internet, we depended primarily on our relationships," says Toolis. "But now that we’re at a certain level, we’re spending more on our website and social media, which gets expensive. And gets harder and harder to compete.”

Toolis says that on practically every job it bids, VOA goes against the largest firms in the world. Becoming part of Stantec “gives us a lot more firepower.” And while the VOA brand will disappear, Toolis says his company’s relationships with clients “don’t necessarily depend on our name.”

Related Stories

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021