flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stantec agrees to acquire VOA Associates

Architects

Stantec agrees to acquire VOA Associates

This deal reflects an industry where consolidation is a strategic necessity for more firms.


By John Caulfield, Senior Editor | February 11, 2016

One of VOA Associates' strengths is the cultural and entertainment sector, and its recent work includes the renovation and expansion of the Museum of Arts and Sciences in Daytona, Fla., pictured above. Merging its operations with Stantec brings together companies with “a commitment to design,” says VOA's Chairman Mike Toolis. Image: VOA Associates

Stantec, one of the industry’s largest architecture/engineering firms, has signed a letter of intent to acquire Chicago-based VOA Associates, a top-10 architectural firm with eight offices and 280 employees in the U.S., Brazil, and China.

Based in Edmonton, Alberta, Stantec operates from over 250 offices worldwide. Its 15,000 employees include 3,800 who work in its building design practice, which the acquisition of VOA is expected to bolster.

“VOA strengthens our collective ability to grow our building practice in U.S. markets,” said Bob Gomes, PE, Stantec’s President and CEO. “Their talented staff has produced an impressive portfolio of workplace, healing, leisure, learning, civic, and entertainment venues.”

Stantec is acquiring VOA’s stock, but it did not disclose the terms of the agreement. If the parties complete this deal in late March, as planned, it would be Stantec’s 13th acquisition since January 2014. Recent transactions include its July 2015 purchase of certain assets and liabilities of VI Engineering, a 30-person firm, and the August 2015 acquisition of Irvine, Calif.-based, 60-person VA Consulting, a community development, transportation, and water-engineering firm.

In its financial report for the quarter ended September 30, 2015, Stantec reiterated its goal to be a top-10 global design firm, and to grow its business at a compound average rate of 15% per year. Through the first nine months of 2015, Stantec’s gross revenue increased by 15.1% to 2.167 billion Canadian dollars (US$1.55 billion), and its net income rose by 3.7% to C$131.1 million.

“Joining Stantec expands horizons and opportunities for our staff and clients,” says Michael Toolis, AIA, LEED AP, VOA’s Chairman and CEO. “Both firms share a commitment to design, a global growth strategy, and market diversity.”

Stanis Smith, SVP with Stantec, tells BD+C that VOA’s leadership “will absolutely” stay on post merger. Stantec’s operations are divided into four groups, and VOA will be folded into its Buildings Group, whose management structure will be altered to accommodate this integration.  

Smith says the two firms had been discussing this merger for several months. “What we saw is a complimentary fit, with no redundancies. It’s a marriage that make sense in both directions.” Smith adds that during those talks, Stantec and VOA officials identified a number of project opportunities that they could pursue jointly.

Smith says Stantec looks at acquisitions “as a way of getting better, not just bigger. Growth is not the design, but the outcome. You wouldn’t believe the number of inquiries we get, but we’re very selective in our acquisitions, where we’re looking for complimentary skills, geographies, or both.”

Toolis tells BD+C that VOA had considered private equity and international AEC firms as possible suitors. By choosing to join forces with Stantec, VOA “is ready to take another step” by “gaining access to [Stantec’s] size, portfolio, and talent.”

Toolis notes, too, that by acquiring VOA, Stantec will be doubling the size of its New York office, and significantly increasing its presence in Chicago, where VOA employs 140 people and Stantec 50. VOA is active in Orlando, where Stantec didn’t have an office, and is big in the entertainment and defense sectors, which hadn’t been as prominent for Stantec.

“We filled some gaps, and they strengthened our bench,” says Toolis.

The Stantec-VOA agreement comes at a time when consolidation (or rumblings about potential deals) within the AEC industry appears to be gaining momentum. Earlier this month, for example, London-based GB Fitzsimon, a cost and project consultant, announced it would merge with Cumming, a Los Angeles-based international project management and construction services firm.

A survey conducted last year by Zweig Group found that 42% of the architecture and planning firms polled were considering acquisitions, compared to 30% in 2012; and that 68% of the firms polled include a merger or acquisition in their strategic plans for the next five years.

VOA has been in business 46 years and is currently a decent-sized company—it generated more than $70 million in architecture revenue in 2014. But Toolis says his firm acknowledged that size matters at this moment in its history.

“Before the Internet, we depended primarily on our relationships," says Toolis. "But now that we’re at a certain level, we’re spending more on our website and social media, which gets expensive. And gets harder and harder to compete.”

Toolis says that on practically every job it bids, VOA goes against the largest firms in the world. Becoming part of Stantec “gives us a lot more firepower.” And while the VOA brand will disappear, Toolis says his company’s relationships with clients “don’t necessarily depend on our name.”

Related Stories

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 8, 2014

Gehry, Foster unveil plans for Battersea Power Station redevelopment [slideshow]

Phase 3 of the massive redevelopment of the London landmark will include more than 1,300 residential units, a 160-room hotel, and 350,000 sf of retail space.

| Apr 8, 2014

Fire resistive curtain wall helps The Kensington meet property line requirements

The majority of fire rated glazing applications occur inside a building to allow occupants to exit the building safely or provide an area of refuge during a fire. But what happens when the threat of fire comes from the outside? This was the case for The Kensington, a mixed-use residential building in Boston.

| Apr 8, 2014

First look: Zaha Hadid reveals design for dreamy sculptural hotel

Hadid's design, which will become the fifth hotel tower in the City of Dreams entertainment hub in Macau, features a latticed exoskeleton enveloping the building's exterior.  

| Apr 8, 2014

Understanding value billing vs. conventional billing

Every company is a sum of the value it delivers to its clients. What differs from one company to the next is how that value is delivered and perceived. All too often, it is based solely on the fee you charge.

| Apr 8, 2014

Science, engineering find common ground on the Northeastern University campus [slideshow]

The new Interdisciplinary Science and Engineering Building is designed to maximize potential of serendipitous meetings between researchers.

| Apr 8, 2014

40 Under 40 winners: Meet the contractors

Of the up-and-coming AEC professionals to be named to the class of 2014, nine make their living as contractors.

| Apr 7, 2014

40 Under 40 winners: Meet the architects

Of the up-and-coming AEC professionals to be named 40 Under 40 winners by the editors of Building Design+Construction, 21 make their living in the architecture profession.

| Apr 4, 2014

$25 million Orion Jet Center designed by SchenkelShultz now open

As the centerpiece of the 45-acre campus, which is its first phase of a planned 215-acre mixed-use development, the 18,000 square foot executive terminal facility offers spacious passenger areas, administrative space, an executive suite, rental car kiosk, catering and a cafe. 

| Apr 3, 2014

Security, accountability, and cloud access: Can you really have it all?

I’ve heard countless stories of conversations between project engineers and IT professionals who can’t come to an agreement on the level of security needed to protect their data while making it more accessible—not only externally, but also internally. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021