flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stantec agrees to acquire VOA Associates

Architects

Stantec agrees to acquire VOA Associates

This deal reflects an industry where consolidation is a strategic necessity for more firms.


By John Caulfield, Senior Editor | February 11, 2016

One of VOA Associates' strengths is the cultural and entertainment sector, and its recent work includes the renovation and expansion of the Museum of Arts and Sciences in Daytona, Fla., pictured above. Merging its operations with Stantec brings together companies with “a commitment to design,” says VOA's Chairman Mike Toolis. Image: VOA Associates

Stantec, one of the industry’s largest architecture/engineering firms, has signed a letter of intent to acquire Chicago-based VOA Associates, a top-10 architectural firm with eight offices and 280 employees in the U.S., Brazil, and China.

Based in Edmonton, Alberta, Stantec operates from over 250 offices worldwide. Its 15,000 employees include 3,800 who work in its building design practice, which the acquisition of VOA is expected to bolster.

“VOA strengthens our collective ability to grow our building practice in U.S. markets,” said Bob Gomes, PE, Stantec’s President and CEO. “Their talented staff has produced an impressive portfolio of workplace, healing, leisure, learning, civic, and entertainment venues.”

Stantec is acquiring VOA’s stock, but it did not disclose the terms of the agreement. If the parties complete this deal in late March, as planned, it would be Stantec’s 13th acquisition since January 2014. Recent transactions include its July 2015 purchase of certain assets and liabilities of VI Engineering, a 30-person firm, and the August 2015 acquisition of Irvine, Calif.-based, 60-person VA Consulting, a community development, transportation, and water-engineering firm.

In its financial report for the quarter ended September 30, 2015, Stantec reiterated its goal to be a top-10 global design firm, and to grow its business at a compound average rate of 15% per year. Through the first nine months of 2015, Stantec’s gross revenue increased by 15.1% to 2.167 billion Canadian dollars (US$1.55 billion), and its net income rose by 3.7% to C$131.1 million.

“Joining Stantec expands horizons and opportunities for our staff and clients,” says Michael Toolis, AIA, LEED AP, VOA’s Chairman and CEO. “Both firms share a commitment to design, a global growth strategy, and market diversity.”

Stanis Smith, SVP with Stantec, tells BD+C that VOA’s leadership “will absolutely” stay on post merger. Stantec’s operations are divided into four groups, and VOA will be folded into its Buildings Group, whose management structure will be altered to accommodate this integration.  

Smith says the two firms had been discussing this merger for several months. “What we saw is a complimentary fit, with no redundancies. It’s a marriage that make sense in both directions.” Smith adds that during those talks, Stantec and VOA officials identified a number of project opportunities that they could pursue jointly.

Smith says Stantec looks at acquisitions “as a way of getting better, not just bigger. Growth is not the design, but the outcome. You wouldn’t believe the number of inquiries we get, but we’re very selective in our acquisitions, where we’re looking for complimentary skills, geographies, or both.”

Toolis tells BD+C that VOA had considered private equity and international AEC firms as possible suitors. By choosing to join forces with Stantec, VOA “is ready to take another step” by “gaining access to [Stantec’s] size, portfolio, and talent.”

Toolis notes, too, that by acquiring VOA, Stantec will be doubling the size of its New York office, and significantly increasing its presence in Chicago, where VOA employs 140 people and Stantec 50. VOA is active in Orlando, where Stantec didn’t have an office, and is big in the entertainment and defense sectors, which hadn’t been as prominent for Stantec.

“We filled some gaps, and they strengthened our bench,” says Toolis.

The Stantec-VOA agreement comes at a time when consolidation (or rumblings about potential deals) within the AEC industry appears to be gaining momentum. Earlier this month, for example, London-based GB Fitzsimon, a cost and project consultant, announced it would merge with Cumming, a Los Angeles-based international project management and construction services firm.

A survey conducted last year by Zweig Group found that 42% of the architecture and planning firms polled were considering acquisitions, compared to 30% in 2012; and that 68% of the firms polled include a merger or acquisition in their strategic plans for the next five years.

VOA has been in business 46 years and is currently a decent-sized company—it generated more than $70 million in architecture revenue in 2014. But Toolis says his firm acknowledged that size matters at this moment in its history.

“Before the Internet, we depended primarily on our relationships," says Toolis. "But now that we’re at a certain level, we’re spending more on our website and social media, which gets expensive. And gets harder and harder to compete.”

Toolis says that on practically every job it bids, VOA goes against the largest firms in the world. Becoming part of Stantec “gives us a lot more firepower.” And while the VOA brand will disappear, Toolis says his company’s relationships with clients “don’t necessarily depend on our name.”

Related Stories

Building Team | Jul 14, 2022

ABC’s construction backlog inches lower in June; Contractor confidence falters

Associated Builders and Contractors reports today that its Construction Backlog Indicator fell 0.1 months in June and stands at 8.9 months, according to an ABC member survey conducted June 21 to July 5.

Sustainable Development | Jul 14, 2022

Designing for climate change and inclusion, with CBT Architects' Kishore Varanasi and Devanshi Purohit

Climate change is having a dramatic impact on urban design, in terms of planning, materials, occupant use, location, and the long-term effect of buildings on the environment. Joining BD+C's John Caulfield to discuss this topic are two experts from the Boston-based CBT Architects: Kishore Varanasi, a Principal and director of urban design; and Devanshi Purohit, an Associate Principal.

Multifamily Housing | Jul 14, 2022

Multifamily rents rise again in June, Yardi Matrix reports

Average U.S. multifamily rents rose another $19 in June to edge over $1,700 for the first time ever, according to the latest Yardi® Matrix Multifamily Report.

Building Team | Jul 14, 2022

Austin PBS gets a new state-of-the-art facility with three studios

Since the 1970s, Austin PBS, birthplace of the Austin City Limits TV series, has been based inside the communications building on the University of Texas campus—a space it has long outgrown.

Building Team | Jul 13, 2022

The YIMBY movement emerges as valuable advocate for affordable housing

Over the past few decades, developers grew accustomed to nothing but staunch opposition to dense affordable housing project proposals.

Energy | Jul 13, 2022

Electrification of buildings, new and old, furthers environmental responsibility and equity

 It’s almost a cliché in our industry, but nonetheless: The greenest building is the one that is already built. 

Building Team | Jul 13, 2022

Austin’s newest entertainment and hospitality complex has been made from repurposed shipping containers

A new entertainment and hospitality complex in Austin, The Pitch, has been made out of repurposed shipping containers. 

Codes and Standards | Jul 12, 2022

USGBC sets out principles for LEED’s future

The U.S. Green Building Council recently published a report containing principles outlining how LEED will evolve.

Building Team | Jul 12, 2022

10 resource reduction measures for more efficient and sustainable biopharma facilities

Resource reduction measures are solutions that can lead to lifecycle energy and cost savings for a favorable return on investment while simultaneously improving resiliency and promoting health and wellness in your facility.

Office Buildings | Jul 12, 2022

Miami office tower nears completion, topping off at 55 stories

In Miami, construction of OKO Group and Cain International’s 830 Brickell office tower is nearing completion.

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021