flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stalled Conference House Park pavilion renovation moving forward

Reconstruction & Renovation

Stalled Conference House Park pavilion renovation moving forward

The pavilion has been awaiting repair since storm damage in 2011 rendered the structure unsafe for the public.


By David Malone, Associate Editor | February 16, 2017

Rendering courtesy of Sage and Coombe

In 2002, the pavilion in Staten Island’s Conference House Park, which is located in an area that makes it very prone to storm damage, was rebuilt as part of a $14 million park renovation project. But not even 10 years later, in 2011, the pavilion was closed due to weather damage to the roof and deck that forced the city to deem the structure unsafe for the public. Almost six full years later, the pavilion is still closed and awaiting repair.

A $3.7 million renovation has been in place for the pavilion, but, as Curbed New York reports, a series of setbacks has kept the project from progressing. The project received funding in 2015, but stalled due to inter-agency conflict. Later, in 2016, construction was also set to begin, but was once again delayed.

However, it appears as though construction on the project will finally get underway this year, as the Department of Parks has issued an invitation for construction bids.

Once completed (if another delay is indeed avoided) the new pavilion will provide 4,200 sf of space and can be used for weddings, concerts, or other public events. Sage and Coombe designed the new pavilion.

Related Stories

| Dec 21, 2011

Hoboken Terminal restoration complete

Restoration of ferry slips, expanded service to benefit commuters.

| Dec 20, 2011

Aragon Construction leading build-out of foursquare office

The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.

| Dec 19, 2011

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.

| Dec 19, 2011

Summit Design+Build selected as GC for Chicago recon project

The 130,000 square foot building is being completely renovated.

| Dec 12, 2011

Skanska to expand and renovate hospital in Georgia for $103 Million

The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 10, 2011

Energy performance starts at the building envelope

Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.

| Dec 8, 2011

Keast & Hood Co. part of Statue of Liberty renovation team

Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021