A long-delayed $1.5 billion mixed-use development in Miami moved ahead after city planners approved the project’s first phase. Phase one of Miami Worldcenter will feature three mostly residential towers of varying heights, a shopping complex, and three public plazas on 27 acres.
Phase two, which includes building a convention center and hotel, has yet to be approved after the city planning board did not agree to rewrite zoning rules for the project. The project has endured eight years of planning and delays.
Three mostly residential towers will crown the retail center and share a nine-acre amenity deck 13 stories high. The towers, at 56 stories, 47 stories and 34 stories, will have 1,200 units. Planned shops, including Macy’s and Bloomingdale’s, and restaurants would cover 765,000 sf of space.
Retail developers The Forbes Company and Taubman will jointly develop the shopping center. Architects Elkus/Manfredi of Boston is designing the master plan along with the retail center and the tallest tower. ADD and Nichols Brosch Wurst Wolfe of Miami will design the other towers.
(http://www.miamiherald.com/2014/06/30/4211508/plans-submitted-for-miami-world.html)
Related Stories
Codes and Standards | Mar 21, 2019
New York City contractors adding 5% to 10% to construction costs due to trade war
Tariffs on steel, aluminum, and other materials swell budgets.
Codes and Standards | Mar 20, 2019
Codes organizations to develop new guidelines on shipping containers as building components
Intl. Code Council and Modular Building Institute combine forces.
Codes and Standards | Mar 19, 2019
Plan for transformation of Lower Manhattan streetscapes unveiled
Pedestrian-friendly “Slow Streets” pilot starts on Earth Day 2019.
Codes and Standards | Mar 15, 2019
Newly developed building materials could have big impact on sustainability
Transparent wood, self-cooling walls, bricks that filter air pollutants among the technological breakthroughs.
Codes and Standards | Mar 14, 2019
U.S. and Canada differ on how to evaluate field performance of windows, curtain walls
Variations include laboratory test method for determining rate of air leakage.
Codes and Standards | Mar 13, 2019
Climate change can’t be stabilized without addressing urban sprawl
Even if power goes green, transportation will still be a major emissions source.
Codes and Standards | Mar 12, 2019
Virginia county hones new rainwater harvesting standard
Developer prompts new rules to use rainwater for heating and air conditioning.
Codes and Standards | Mar 8, 2019
Portland delays requirement for posted warnings on unreinforced brick and stone buildings
Regulation would mandate signs warning that buildings could be unsafe during earthquakes.
Codes and Standards | Mar 7, 2019
California will allow flame retardant-free building insulation
State also repeals business furniture flammability standard.
Codes and Standards | Mar 6, 2019
Sixty six construction companies cited for wage theft violations in Massachusetts
Penalties total $2.7 million.