flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stalled $1.5 billion Miami mixed-use redevelopment project advances

Stalled $1.5 billion Miami mixed-use redevelopment project advances

Residential towers, shopping complex, convention center, and hotel are planned


By BD+C Staff | July 31, 2014
Rendering: courtesy www.miamiworldcenter.com
Rendering: courtesy www.miamiworldcenter.com

A long-delayed $1.5 billion mixed-use development in Miami moved ahead after city planners approved the project’s first phase. Phase one of Miami Worldcenter will feature three mostly residential towers of varying heights, a shopping complex, and three public plazas on 27 acres.

Phase two, which includes building a convention center and hotel, has yet to be approved after the city planning board did not agree to rewrite zoning rules for the project. The project has endured eight years of planning and delays.

Three mostly residential towers will crown the retail center and share a nine-acre amenity deck 13 stories high. The towers, at 56 stories, 47 stories and 34 stories, will have 1,200 units. Planned shops, including Macy’s and Bloomingdale’s, and restaurants would cover 765,000 sf of space.

Retail developers The Forbes Company and Taubman will jointly develop the shopping center. Architects Elkus/Manfredi of Boston is designing the master plan along with the retail center and the tallest tower. ADD and Nichols Brosch Wurst Wolfe of Miami will design the other towers.

(http://www.miamiherald.com/2014/06/30/4211508/plans-submitted-for-miami-world.html)

Related Stories

Codes and Standards | Jun 1, 2021

Federal plan to double Canadian lumber tariffs draws intense criticism

Builders advised to stock up to deal with shortages.

Codes and Standards | Jun 1, 2021

Passive House standards proving their worth in multifamily sector

Energy performance beats conventionally built by 32% to 58%.

Codes and Standards | May 27, 2021

Pittsburgh combats construction fraud

Crackdown on tax, insurance, and workers’ comp malfeasance.

Codes and Standards | May 26, 2021

Proposal to add photovoltaic panels to the R2 Standard for electronics recycling

Hundreds of facilities in 33 countries could begin recycling PVs.

Codes and Standards | May 25, 2021

International Energy Agency lays out roadmap to net zero

Focus is on energy generation, but building efficiency also plays a role.

Codes and Standards | May 24, 2021

Biden Administration will make new investments in building energy efficiency

Focus on grid-interactive buildings; Energy Star expansion; new targets for energy, water reduction.

Codes and Standards | May 20, 2021

Solar panel trade group issues guidelines to rid use of components built with forced labor

Growing concern that PV industry is dependent on work camps in China.

Codes and Standards | May 19, 2021

Smart electric panels can aid transition to renewable energy

Allow customers better control of circuits; utilities can better manage demand.

Codes and Standards | May 18, 2021

Cross-laminated timber performs better than expected in shear test

Tests conducted in support of new criteria for design of CLT diaphragm.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021