flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stalled $1.5 billion Miami mixed-use redevelopment project advances

Stalled $1.5 billion Miami mixed-use redevelopment project advances

Residential towers, shopping complex, convention center, and hotel are planned


By BD+C Staff | July 31, 2014
Rendering: courtesy www.miamiworldcenter.com
Rendering: courtesy www.miamiworldcenter.com

A long-delayed $1.5 billion mixed-use development in Miami moved ahead after city planners approved the project’s first phase. Phase one of Miami Worldcenter will feature three mostly residential towers of varying heights, a shopping complex, and three public plazas on 27 acres.

Phase two, which includes building a convention center and hotel, has yet to be approved after the city planning board did not agree to rewrite zoning rules for the project. The project has endured eight years of planning and delays.

Three mostly residential towers will crown the retail center and share a nine-acre amenity deck 13 stories high. The towers, at 56 stories, 47 stories and 34 stories, will have 1,200 units. Planned shops, including Macy’s and Bloomingdale’s, and restaurants would cover 765,000 sf of space.

Retail developers The Forbes Company and Taubman will jointly develop the shopping center. Architects Elkus/Manfredi of Boston is designing the master plan along with the retail center and the tallest tower. ADD and Nichols Brosch Wurst Wolfe of Miami will design the other towers.

(http://www.miamiherald.com/2014/06/30/4211508/plans-submitted-for-miami-world.html)

Related Stories

| Apr 26, 2012

Lack of bolts on steel support caused collapse at Cincinnati casino

Too few bolts connecting horizontal steel support beams with vertical steel columns was the cause of January’s construction accident at Horseshoe Casino Cincinnati, according to the report of the Occupational Safety and Health Administration.

| Apr 26, 2012

OSHA criticized for taking too long to roll out safety rules

The Occupational Safety and Health Administration takes far too long to adopt new safety regulations compared to other agencies’ development of rules, safety experts said during a Senate hearing.

| Apr 26, 2012

Contractors fear that GSA scandal will lead to fewer federal construction contracts

In the wake of the recent scandal at the General Services Administration in which workers spent lavishly at a Las Vegas conference, a spokesman for Associated General Contractors of America said contractors are worried the scandal will result in cuts to GSA's construction and renovation budgets.

| Apr 26, 2012

Developers can use LEED wastewater credits to help gain approvals in environmentally sensitive locales

Those wanting to pursue development in heavily regulated and environmentally sensitive areas are benefiting by designing projects that qualify for LEED points, even if the project as a whole does not achieve certification.

| Apr 26, 2012

New York City Council moves to license elevator mechanics

New York’s City Council introduced a measure last week that would require the city’s 7,000 elevator mechanics to meet national standards and be licensed by the city.

| Apr 23, 2012

AAMA releases updated specification for anodized aluminum

AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.

| Apr 19, 2012

Michigan legislature tackling controversial rules on electricians

A fight is brewing in the Michigan legislature over how many fully qualified electricians must be present during electrical work when apprentices also are on hand.

| Apr 19, 2012

Washington city may base building code on rising sea level due to global warming

Aberdeen may become the first city in Washington to base a building code on rising oceans and global warming.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021