flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stalled $1.5 billion Miami mixed-use redevelopment project advances

Stalled $1.5 billion Miami mixed-use redevelopment project advances

Residential towers, shopping complex, convention center, and hotel are planned


By BD+C Staff | July 31, 2014
Rendering: courtesy www.miamiworldcenter.com
Rendering: courtesy www.miamiworldcenter.com

A long-delayed $1.5 billion mixed-use development in Miami moved ahead after city planners approved the project’s first phase. Phase one of Miami Worldcenter will feature three mostly residential towers of varying heights, a shopping complex, and three public plazas on 27 acres.

Phase two, which includes building a convention center and hotel, has yet to be approved after the city planning board did not agree to rewrite zoning rules for the project. The project has endured eight years of planning and delays.

Three mostly residential towers will crown the retail center and share a nine-acre amenity deck 13 stories high. The towers, at 56 stories, 47 stories and 34 stories, will have 1,200 units. Planned shops, including Macy’s and Bloomingdale’s, and restaurants would cover 765,000 sf of space.

Retail developers The Forbes Company and Taubman will jointly develop the shopping center. Architects Elkus/Manfredi of Boston is designing the master plan along with the retail center and the tallest tower. ADD and Nichols Brosch Wurst Wolfe of Miami will design the other towers.

(http://www.miamiherald.com/2014/06/30/4211508/plans-submitted-for-miami-world.html)

Related Stories

| Sep 11, 2013

White paper examines Joint Commission requirements for NFPA codes in healthcare

The healthcare industry has experienced great attention from The Joint Commission concerning fire and life safety issues.

| Sep 11, 2013

San Francisco expected to drop firefighter air tank refilling station rule for skyscrapers

San Francisco is poised to drop a requirement that skyscrapers have refill stations so firefighters can recharge their air tanks during a blaze. The city has required that new high-rises have the air refill systems for about ten years. 

| Sep 5, 2013

State legislatures continue to raise the bar on green school construction

Since the beginning of 2013, the USGBC has followed more than 125 bills across 34 states that seek to advance healthy, high-performing schools.

| Sep 5, 2013

Construction industry groups create coalition to respond to new OSHA silica rule

A group of 11 construction trade associations has created the Construction Industry Safety Coalition in response to the Occupational Safety and Health Administration’s (OSHA) proposed rule on silica for the construction industry.

| Sep 5, 2013

Red tape delays California county jail construction projects

California authorized $1.2 billion for jail construction in 2007, but not a single county in the state has completed a jail project since then.

| Sep 5, 2013

New CM-at-risk and design-build options create controversy in Ohio

Some contractors say Ohio's new system puts small and midsize construction companies at a disadvantage.

| Sep 5, 2013

Outdated codes slowed disaster recovery in Tuscaloosa, Ala.

Outdated building codes and lack of a master plan slowed the initial rebuilding stage after a devastating tornado leveled parts of Tuscaloosa, Ala. in 2011, according to the city’s mayor.

| Aug 28, 2013

Building collapse prompts legislation to beef up demolition regulations in Philadelphia

Philadelphia City Council will introduce legislation next month to strengthen the regulation of building demolition practices.

| Aug 28, 2013

Rules requiring contractors to boost hiring of veterans criticized

Some businesses are pushing back against proposed rules requiring federal contractors to step up their hiring of returning military service personnel.

| Aug 28, 2013

OSHA moves to reduced exposure to crystalline silica

Under a proposal from the Occupational Safety and Health Administration, the new permissible exposure limit to crystalline silica per cubic meter of air could be changed from 250 micrograms to 50 micrograms.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021