flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stalled $1.5 billion Miami mixed-use redevelopment project advances

Stalled $1.5 billion Miami mixed-use redevelopment project advances

Residential towers, shopping complex, convention center, and hotel are planned


By BD+C Staff | July 31, 2014
Rendering: courtesy www.miamiworldcenter.com
Rendering: courtesy www.miamiworldcenter.com

A long-delayed $1.5 billion mixed-use development in Miami moved ahead after city planners approved the project’s first phase. Phase one of Miami Worldcenter will feature three mostly residential towers of varying heights, a shopping complex, and three public plazas on 27 acres.

Phase two, which includes building a convention center and hotel, has yet to be approved after the city planning board did not agree to rewrite zoning rules for the project. The project has endured eight years of planning and delays.

Three mostly residential towers will crown the retail center and share a nine-acre amenity deck 13 stories high. The towers, at 56 stories, 47 stories and 34 stories, will have 1,200 units. Planned shops, including Macy’s and Bloomingdale’s, and restaurants would cover 765,000 sf of space.

Retail developers The Forbes Company and Taubman will jointly develop the shopping center. Architects Elkus/Manfredi of Boston is designing the master plan along with the retail center and the tallest tower. ADD and Nichols Brosch Wurst Wolfe of Miami will design the other towers.

(http://www.miamiherald.com/2014/06/30/4211508/plans-submitted-for-miami-world.html)

Related Stories

| Nov 14, 2014

Army net-zero initiative moving past pilot stage

The U.S Army's ambitious net-zero initiative has had several successful pilot trials, and planners are prepared to expand the nine-part demonstration field to scores of other Army facilities.

| Nov 14, 2014

Former U.S. Treasury Secretary Paulson works to upgrade China’s building codes

Former U.S. Treasury Secretary Hank Paulson is today focused on making new construction in China more energy efficient by working with leaders to upgrade building codes.

| Nov 14, 2014

California aims for 20% reduction in water consumption by 2020

California’s comprehensive new water use plan makes conservation a priority, reinforcing a 2009 plan to reduce statewide per capita water consumption by 20% by 2020.

| Nov 6, 2014

Demountable structural steel could up the ante on sustainability

Demountable structural steel assemblies would be a greener way to make use of steel in the construction industry than recycling.

K-12 Schools | Nov 6, 2014

New Sandy Hook school features could influence security standards

The design of the new Sandy Hook Elementary School on the site of the 2012 Newtown, Conn., school shooting features enhanced security measures—some subtle and others more prominent.

| Nov 6, 2014

OSHA seeking input on electrical standards

The Occupational Safety and Health Administration (OSHA) is reviewing electrical standards for the construction industry to make sure proper safeguards are in place as electrical wiring is being installed and maintained.

Smart Buildings | Oct 30, 2014

Energy Department pledges $9 million for energy efficiency improvements on commercial buildings

The U.S. Dept. of Energy will spend $9 million to encourage investments in energy-saving technologies that can be tested and deployed in offices, shops, restaurants, hospitals, hotels and other types of commercial buildings.

| Oct 30, 2014

Steel Framing Industry Association’s certification program aims to ensure connector quality

The Steel Framing Industry Association has launched a certification program to ensure that cold-formed steel connectors meet quality guidelines, building codes, and ASTM standards.

| Oct 30, 2014

American Concrete Institute releases reorganized structural concrete code requirements

The reorganized document is organized from an engineer’s perspective. The requirements flow more intuitively and have fewer cross-references for improved logic and flow of information.

| Oct 30, 2014

USGBC pushes back LEED v4 deadline

Extending the deadline gives LEED users additional time to prepare for LEED v4, the latest version of LEED, which features increased rigor and multiple updates.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021