flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Codes and Standards

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Study finds significant problems with how city manages capital projects.


By Peter Fabris, Contributing Editor | April 24, 2017

PIxabay Public Domain

A new report released by the Center for an Urban Future found significant flaws in how New York City manages capital projects for libraries and cultural institutions.

These projects encounter “staggering delays and exorbitant costs” the report says. The median new library and cultural project takes about seven years to complete and costs $930 per square foot, or roughly twice the cost of building a new office tower in the city, the report says.

The report, a joint project with the Citizens Budget Commission, analyzed 144 capital projects for libraries and cultural organizations completed between fiscal years 2010 and 2014. All were managed by the city’s Department of Design and Construction (DDC).

The report found that even seemingly routine maintenance projects end up taking years. For instance, the median mechanical system upgrade—including replacement and installation of fire alarms, boilers, and heating/cooling systems—took 4.3 years to complete. The study also found that when institutions are granted permission to self-manage capital projects, which is allowed on rare occasions, the projects typically take a fraction of the time and cost roughly 40% less.

Related Stories

Codes and Standards | Jan 30, 2020

Dramatic demographic shifts poised to alter global workplace

By 2030, Millennials and Generation Z will dominate workforce.

Codes and Standards | Jan 29, 2020

Half of Manhattan’s new residential skyscrapers are empty

Excess comes as middle class housing shortage worsens.

Codes and Standards | Jan 28, 2020

Updated Engineered Wood Construction Guide now available

Provides guidance on building engineered wood floors, walls, and roofs.

Codes and Standards | Jan 24, 2020

Fenestration Rating Council earns ANSI certification

FenStar Certification Program ensures windows, doors, and skylights meet Energy Star specifications.

Codes and Standards | Jan 23, 2020

Rent control policies backfire on goal of boosting affordable housing

Natl. Apartment Assn. study says rent control decreases housing supply, harms condition of housing stock.

Codes and Standards | Jan 22, 2020

Potential energy savings from smart meters is largely unrealized

Most utilities underuse the technology that can help customers save money.

Codes and Standards | Jan 21, 2020

Contractors pay practices reviewed in new database

Fastest and slowest paying GCs revealed.

Codes and Standards | Jan 17, 2020

Several states with ambitious climate goals will have to restrict natural gas as a fuel

Buildings would have to heat and cook with electricity.

Codes and Standards | Jan 16, 2020

New solar-ready mandate affects commercial and residential buildings in St. Louis

All new buildings must have reserved rooftop sections for PVs.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021