A new report released by the Center for an Urban Future found significant flaws in how New York City manages capital projects for libraries and cultural institutions.
These projects encounter “staggering delays and exorbitant costs” the report says. The median new library and cultural project takes about seven years to complete and costs $930 per square foot, or roughly twice the cost of building a new office tower in the city, the report says.
The report, a joint project with the Citizens Budget Commission, analyzed 144 capital projects for libraries and cultural organizations completed between fiscal years 2010 and 2014. All were managed by the city’s Department of Design and Construction (DDC).
The report found that even seemingly routine maintenance projects end up taking years. For instance, the median mechanical system upgrade—including replacement and installation of fire alarms, boilers, and heating/cooling systems—took 4.3 years to complete. The study also found that when institutions are granted permission to self-manage capital projects, which is allowed on rare occasions, the projects typically take a fraction of the time and cost roughly 40% less.
Related Stories
Codes and Standards | Jun 28, 2018
Modular construction may be key to relieving housing crunch
May be only way to meet needs as ranks of construction workers decline.
Codes and Standards | Jun 27, 2018
Thirty nine San Francisco high rises at risk of collapse in major earthquake
Vulnerable buildings have welded columns and beams.
Codes and Standards | Jun 26, 2018
Boston enacts new climate resiliency rules for buildings
New policy is likely a first in the nation.
Codes and Standards | Jun 25, 2018
Integrated Project Delivery guide offered by Pankow Foundation
An Action Guide for Leaders offers answers to critical IPD questions.
Codes and Standards | Jun 21, 2018
New app said to automate code compliance
Startup offers plug-in that scans 3D models.
Codes and Standards | Jun 20, 2018
Home values and local tax revenues at risk from high tide flooding, scientists group says
Analysis of property data identifies communities prone to frequent flooding.
Codes and Standards | Jun 19, 2018
Structural engineered wood products exempt from new EPA formaldehyde ruling
Exempt products include structural plywood, oriented strand board (OSB).
Codes and Standards | Jun 18, 2018
Seattle City Council repeals controversial new per-worker tax on large employers
Measure was aimed at raising $50 million for homeless services, affordable housing.
Codes and Standards | Jun 14, 2018
Hardscape from development makes ‘1,000-year’ flood in Maryland worse
Impermeable concrete made it easier for water to overwhelm drainage system.
Codes and Standards | Jun 13, 2018
United States Resiliency Council announces support for Calif. earthquake resiliency bill
Measure would help cities identify structures that could fail in major quake.