flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Springdale Green office campus granted approval in East Austin

Office Buildings

Springdale Green office campus granted approval in East Austin

Gensler is designing the project in collaboration with landscape architect dwg.


By David Malone, Associate Editor | June 24, 2021
Springdale Green exterior of office campus
Springdale Green exterior of office campus

Springdale Green, a new office campus comprising two six-story office buildings totaling 872,500 rentable sf, has been granted approval in East Austin.

The Gensler-designed project will include extensive outdoor amenities and state-of-the-art infrastructure to create a work setting focused on sustainability and wellness. The campus offers a new way of working with multiple outdoor areas, an 18,000-sf flex/conference space with a dedicated outdoor patio, and a 23,000-sf fitness and wellness center that is exclusive to campus employees. An onsite parking garage will support multiple modes of transportation including indoor storage for 308 bikes and 46 electric vehicle charging stations, with the ability to expand to a total of 345 charging stations.

 

Springdale Green exterior

 

The office buildings will combine to feature 36,000 sf of signature terraces that create a garden-like extension of the interior. The fitness center will offer classes and personal training such as yoga, bootcamp, basketball, and volleyball. It will also directly connect to outdoor amenities such as nearly a mile of boardwalk, a jogging loop, and nature trails.

 

Springdale Green terrace

 

A little of two-thirds of the 30-acre campus will be preserved and restored with native meadows, woodland and plantings, and an urban creek tributary. A 600,000-gallon underground cistern will capture and store rainwater, as well as harvest air conditioning condensate that will then be used to irrigate the landscape. The site’s stormwater will be treated and cleaned using rain gardens and a bio-retention basin that will help prevent downstream flooding.

The project is targeting LEED Gold and Austin Energy Green Building 3-Star.

 

Springdale Green garden

 

Springdale Green boardwalk

 

Springdale Green terrace

 

Springdale Green interior

Related Stories

Office Buildings | Mar 5, 2015

Goettsch Partners unveils plans for dual office towers in Warsaw

The Mennica Legacy Tower development is divided into a 35-story tower located on the south east side of the site and a 10-story building on the west side.

High-rise Construction | Mar 4, 2015

Must see: Egypt planning 656-foot pyramid skyscraper in Cairo

Zayed Crystal Spark Tower will stand 200 meters tall and will be just a short distance from the pyramids of Giza. 

Transit Facilities | Mar 4, 2015

5+design looks to mountains for Chinese transport hub design

The complex, Diamond Hill, will feature sloping rooflines and a mountain-like silhouette inspired by traditional Chinese landscape paintings.

Office Buildings | Mar 3, 2015

Former DuPont lab to be converted into business incubator near UPenn campus

The new Pennovation Center will provide collaborative and research spaces for educators, scientists, students, and the private sector.

Office Buildings | Mar 1, 2015

Google unveils dramatic tent-like, modular-focused plan for corporate HQ

The master plan by Bjarke Ingels and Thomas Heatherwick will wrap highly flexible office blocks in soaring translucent canopies.

Office Buildings | Feb 26, 2015

Using active design techniques to strengthen the corporate workplace and enhance employee wellness

The new Lentz Public Health Center in Nashville, Tenn., serves as a model of how those progressive and healthy changes can be made.

Sponsored | Shopping Centers | Feb 26, 2015

A color-changing gateway for Altara Center

Valspar works with developers to complete a multicolored shopping center façade in Honduras.

Office Buildings | Feb 23, 2015

The importance of quiet and the consequences of distraction

Recent work style studies show that the average knowledge worker spends 25-35% of their time doing heads-down focused work. Once thrown off track, it can take some 23 minutes for a worker to return to the original task.

Codes and Standards | Feb 18, 2015

USGBC concerned about developers using LEED registration in marketing

LEED administrators are concerned about a small group of developers or project owners who tout their projects as “LEED pre-certified” and then fail to follow through with certification.

Office Buildings | Feb 18, 2015

Commercial real estate developers optimistic, but concerned about taxes, jobs outlook

The outlook for the commercial real estate industry remains strong despite growing concerns over sluggish job creation and higher taxes, according to a new survey of commercial real estate professionals by NAIOP.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021