Spire, a new 41-story, 440-foot-tall multifamily tower, has completed in Seattle. The luxury condo tower is the closest high-rise building in the city to the Space Needle. The VIA Architecture-designed project is located on an approximately 10,660-sf triangular site that provides views of Puget Sound, Lake Union, Mount Rainier, Mount Baker, and the Space Needle.
The slender tower includes a welcoming pedestrian environment at its base while the top two floors are dedicated to amenities that allow every resident to access and experience the panoramic views. Amenities are also included on Level 3 and the Ground Level and include private dining, a fitness club, a pet run, co-working space, a theater, bicycle storage, a pet wash station, and a lobby cafe.
The project also features Seattle’s first fully-automated parking system. Drivers will simply drive their vehicles into one of three transfer cabins, exit the vehicle, and initiate the parking process. The Sotefin system does the rest.
Floor plans are offered in one-, two-, and three-bedroom units. Residences include natural wood doors, engineered hardwood oak floors, energy efficient LED lighting, Whirlpool washers and dryers, custom kitchen islands with pendant lighting, and quartz countertops. Five penthouses are also included on Level 39 ranging from 670 sf to 2100 sf. The project’s designers removed an entire floor of residences from the building and redistributed the volume to offer market-leading ceiling heights of 9.6 feet for regular units and 10 feet for penthouses.
Laconia Development designed the project.
Related Stories
Smart Buildings | Jan 7, 2014
9 mega redevelopments poised to transform the urban landscape
Slowed by the recession—and often by protracted negotiations—some big redevelopment plans are now moving ahead. Here’s a sampling of nine major mixed-use projects throughout the country.
| Jan 3, 2014
World’s tallest vegetated façade to sprout in Sri Lanka [slideshow]
Set to open in late 2015, the 46-story Clearpoint Residences condo tower will feature planted terraces circling the entire structure.
| Dec 31, 2013
BD+C's top 10 stories of 2013
The world's tallest twisting tower and the rise of augmented reality technology in construction were among the 10 most popular articles posted on Building Design+Construction's website, BDCnetwork.com.
| Dec 27, 2013
$1 billion 'city within a city' development approved by Coachella, Calif., city council
The mega development includes 7,800 homes, a retail center, office space, and nearly 350 acres of open space.
| Dec 23, 2013
MBI commends start of module setting at B2, world's tallest modular building
The first modules have been set at B2 residential tower at Atlantic Yards in New York, set to become the tallest modular building in the world.
| Dec 20, 2013
Can energy hogs still be considered efficient buildings? Yes, say engineers at Buro Happold
A new tool from the engineering firm Buro Happold takes into account both energy and economic performance of buildings for a true measure of efficiency.
| Dec 13, 2013
Safe and sound: 10 solutions for fire and life safety
From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies.
| Dec 10, 2013
16 great solutions for architects, engineers, and contractors
From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.
| Dec 4, 2013
First look: Dubai's winning bid for World Expo 2020 [slideshow]
Dubai has been chosen as the site of the 2020 World Expo. HOK led the design team that developed the master plan for the Expo, which is expected to draw more than 25 million visitors from October 2020 through April 2021.
| Nov 27, 2013
Exclusive survey: Revenues increased at nearly half of AEC firms in 2013
Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.