SpeedCore, a composite superstructure system composed of concrete sandwiched between steel plates, recently achieved two notable accomplishments.
Purdue University researchers completed an investigation of SpeedCore's fire performance. “They found that SpeedCore panels under simulated fire and gravity loads demonstrate excellent fire resistance, even without costly additional fire-protective coatings,” according to an American Institute of Steel Construction (AISC) news release.
“With the completion of this research, no fireproofing should be required for any SpeedCore wall as long as it is at least 18 inches thick,” said AISC vice president of engineering & research Lawrence F. Kruth, PE. SpeedCore shaved 43% off the erection time of the Rainier Square Tower in Seattle—the first building to use the system, the release says.
In another development, the New York City Department of Buildings has approved the use of SpeedCore for all five boroughs. SpeedCore will eliminate the need for the temporary braced cores typically used in New York City high-rise projects, the release says.
Related Stories
Codes and Standards | Jul 22, 2020
Mobile app calculates sound transmission for wood-framed assemblies
American Wood Council tool for floor-ceiling assemblies.
Codes and Standards | Jul 22, 2020
Architecture billings remain in negative territory, begin to stabilize
Fewer architecture firms report declining billings this month.
Codes and Standards | Jul 20, 2020
N.Y. construction firm to pay $1.5 million to settle sexual harassment claim
Managers said to demand sex for pay and OT opportunities.
Codes and Standards | Jul 16, 2020
Tips to make optimal use of salvaged materials
Integrated teams, staging warehouse, and looking early and often, among recommendations.
Codes and Standards | Jul 15, 2020
Georgia gives the go-ahead for tall mass timber construction
Standards review scheduled to be completed by July 2021.
Codes and Standards | Jul 15, 2020
Softwood-lumber duties boost expenses amid COVID-19 outbreak
Little hope this year for resolution of trade dispute with Canada.
Codes and Standards | Jul 14, 2020
Metal Construction Assn. releases three EPD updates
Pertain to Metal Composite Materials, Insulated Metal Panels, and Roll Formed Aluminum and Steel Cladding.
Codes and Standards | Jul 13, 2020
5 must reads for the AEC industry today: July 13, 2020
4 technologies for improving building sanitation and tech's ever-evolving impact on the multifamily space.
Codes and Standards | Jul 9, 2020
Funding opportunity for field validation of high-impact building technologies
Dept. of Energy program targets dynamic interactions with electric grid.
Codes and Standards | Jul 8, 2020
Standards for reducing risk of COVID-19 in senior living communities
AIA releases strategies and illustrations for the sector.