flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Specification for sliding door, lift and slide roller assemblies updated

Codes and Standards

Specification for sliding door, lift and slide roller assemblies updated

Addresses market trend toward heavy sliding doors.


By Peter Fabris, Contributing Editor | April 5, 2021

Courtesy Pixabay

The Fenestration and Glazing Industry Alliance (FGIA) released an updated version of a document pertaining to roller assemblies, with or without height adjustment features, for use in sliding doors and lift and slide doors.

AAMA 906-21, Specification for Sliding Door and Lift and Slide Roller Assemblies, was last updated in 2018. “The AAMA 906 task group made quick work of an important update to capture a market trend toward heavy sliding doors,” said Matt Taylor (HOPPE North America), co-chair of the FGIA Heavy Duty Roller Assembly Task Group.

“Previous requirements for operating force considered rollers with rated weight capacities to 100 pounds,” Taylor said. “Now, roller assemblies ranging from weight capacities of 75 pounds to more than 600 pounds will be tested to proportionate levels of operating force.”

Under the updated specification, representative samples of door rollers are evaluated for performance at the weight rating specified by the roller manufacturer by cycling the rollers under load for 10,000 cycles. Clearance and operating force measurements are taken before and after the cycle test to ensure performance remains within specified tolerances.

Related Stories

Codes and Standards | Sep 12, 2017

Washington, D.C. is first LEED Platinum city in the world

All city government buildings are powered by renewables.

Codes and Standards | Sep 11, 2017

Natural solutions would be most effective flood resilience policies for Houston

New green infrastructure should be part of rebuild.

Codes and Standards | Sep 8, 2017

Los Angeles luxury high-rise is first U.S. apartment building to achieve WELL Multifamily certification

Hollywood Proper Residences have verified indoor air and water quality features.

Codes and Standards | Sep 7, 2017

More than half of Houston properties at high or moderate risk of flooding are not in FEMA flood zone

Properties outside of these zones are not required to carry flood insurance.

Codes and Standards | Sep 6, 2017

Seventy percent of contractors have trouble finding workers

AGC survey indicates that fewer companies may be able to bid on projects.

Codes and Standards | Sep 5, 2017

New CTBUH initiatives to investigate link between fire and façades

In wake of Grenfell tragedy, Council forms new workgroup.

Codes and Standards | Sep 1, 2017

U.S. markets with the largest hotel construction pipeline

New York has the largest hotel construction pipeline of any U.S. market.

Codes and Standards | Aug 30, 2017

Trump rescinds elevation requirements for federally funded buildings and infrastructure

Flood protection on subsidized housing, hospitals, and other public buildings rolled back.

Codes and Standards | Aug 30, 2017

Stormwater runoff mitigation pays off for some building owners

Rain gardens, green roofs, cisterns, and rainwater recycling add value.

Codes and Standards | Aug 28, 2017

Commercial properties address state carbon-reduction policies

EV charging stations, batteries, and microgrid technology are all part of effort to meet demand for cleaner power.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021