flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Specification for field testing newly installed storefronts, curtain walls, sloped glazing systems updated

Codes and Standards

Specification for field testing newly installed storefronts, curtain walls, sloped glazing systems updated

The specification is used to verify air infiltration resistance performance and water penetration resistance.


By Peter Fabris, Contributing Editor | May 10, 2024
Image by wal_172619 from Pixabay
Image by wal_172619 from Pixabay

The Fenestration and Glazing Industry Alliance (FGIA) updated a specification establishing requirements for field testing newly installed storefronts, curtain walls, and sloped glazing systems.

AAMA 503-24, Voluntary Specification for Field Testing of Newly Installed Storefronts, Curtain Walls and Sloped Glazing Systems establishes the requirements for field test specimens, apparatus, sampling, test procedures and test reports to be used in verifying the air infiltration resistance performance and/or water penetration resistance performance of newly installed fenestration products.

The Testing Criteria of Commercial Fenestration Updates Task Group completed a full technical review of the specification for the new edition. A new section about significance and use was added. Sections addressing sampling, site preparation, and responsible parties were expanded. The section on test procedures was also revised, clarifying that air leakage resistance testing under AAMA 503 is optional. Definitions of water penetration were also updated.

“When used as part of a comprehensive building commissioning program, AAMA 503 provides reasonable assurance that the installed fenestration products will perform to the specified or rated air leakage and/or water penetration performance levels with allowances given for field performance,” says Jason Seals, FGIA certification services manager, fenestration.

Related Stories

Wood | Apr 8, 2016

New LEED Pilot ACP designed to help eliminate irresponsibly sourced materials

Illegal wood is primary target to restrict illicit material in the supply chain.  

Lighting | Apr 5, 2016

Lighting requirements for high-rise dwellings proposed for energy standard

The requirements would effectively eliminate incandescent and halogen bulbs.

Steel Buildings | Apr 4, 2016

AISI publishes Cold-Formed Steel Framing Design Guide, 2016 Edition

Updates 2007 edition; includes five comprehensive design examples.  

Data Centers | Apr 1, 2016

ASHRAE releases publication on the impact of IT equipment on data center design

The book offers advice for designing structures in the fast-changing data center industry.

Codes and Standards | Mar 28, 2016

Occupant egress simulations that impact codes fall short, researchers say

Building evacuations in emergencies are too dangerous as a result.  

School Construction | Mar 28, 2016

National report on school buildings reports $46 billion annual funding shortfall

Millions of students said to be learning in obsolete facilities.  

Codes and Standards | Mar 25, 2016

ASHRAE grants fund human thermal comfort database project

Aim is to help better understand thermal comfort in residential and commercial buildings.  

Codes and Standards | Mar 25, 2016

OSHA finalizes new silica dust regulations

Construction industry has until June 2017 to comply.  

Wood | Mar 23, 2016

APA updates Engineered Wood Construction Guide

Provides recommendations on engineered wood construction systems.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021