flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

In Southern California, a former industrial zone continues to revitalize with an award-winning office property

Office Buildings

In Southern California, a former industrial zone continues to revitalize with an award-winning office property

The three-floor building offers about 25,000 sf of office and amenity spaces, as well as a variety of sustainable and energy-efficient components.


By Novid Parsi, Contributing Editor | May 4, 2023
In Southern California, a former industrial zone continues to revitalize with an award-winning office property. Photo: Patrick Tang, Take Flyt Imaging
Photo: Patrick Tang, Take Flyt Imaging

In Culver City, Calif., Del Amo Construction, a construction company based in Southern California, has completed the adaptive reuse of 3516 Schaefer St, a new office property. 3516 Schaefer is located in Culver City’s redeveloped Hayden Tract neighborhood, a former industrial zone that has become a technology and corporate hub. In March, Los Angeles Business Journal gave 3516 Schaefer St the top Gold award in the commercial office category.

Owned by Redcar Ltd. and designed by RAC Design Build, with contract administration services from Formation Association, the three-floor property consists of about 25,000 sf of office and amenity spaces. In addition to 18-foot-high floors, the building’s features include a mix of open-floor work areas and conference rooms, a second-floor break room with kitchen space, a third-floor mezzanine area, private patios, outdoor decks on all floors, and a secured parking lot.

Originally, the project site included an existing single-story building that Del Amo Construction removed, as well as a crane-rail steel structure that was modified and incorporated into the new building. The new space, which is adjacent to Redcar’s two-story 3520 Schaefer St, provides an airy, low-rise structure with indoor-outdoor features, a sloping roof line, and an exterior of metal, glass, concrete, and wood.

3516 Schaefer St’s sustainable and energy-efficient components include custom steel windows and doors fabricated to allow for fresh air and ventilation, roof solar panels with a fully integrated photovoltaic system, variable refrigerant flow (VFR) HVAC, EnergyStar appliances, programmable Lutron lighting, three fully operational EV charging stations with eight additional pre-installed locations, bicycle parking, a stormwater capturing drywell system, and drought-tolerant landscaping.

On the Building Team:
Owner/developer: Redcar Ltd.
Design architect and architect of record: RAC Design Build
MEP engineer: AMA Consulting Engineering
Structural engineer: Glotman Simpson
General contractor: Del Amo Construction

In Southern California, a former industrial zone continues to revitalize with an award-winning office property Photo: Patrick Tang, Take Flyt Imaging
Photo: Patrick Tang, Take Flyt Imaging
3516 Schaefer St adaptive reuse 8B2A3940
Photo: Patrick Tang, Take Flyt Imaging
3516 Schaefer St adaptive reuse 8B2A4000
Photo: Patrick Tang, Take Flyt Imaging
3516 Schaefer St adaptive reuse 8B2A3912
Photo: Patrick Tang, Take Flyt Imaging

Related Stories

Wood | Jan 24, 2020

105,000-sf vertical mass timber expansion will cap D.C.’s 80 M Street

Hickok Cole is designing the project.

Office Buildings | Jan 22, 2020

Headspace expands Santa Monica corporate HQ

Montalba Architects designed the project.

Office Buildings | Jan 19, 2020

Internet platform connects its employees with mile-long staircase in new HQ

Color also plays a big role in the interior design of this 19-story building.

Office Buildings | Jan 14, 2020

The workplace should be a tool for improving employee engagement

A survey of 1,600 North American workers hints at what workplace elements have the greatest impact.

Office Buildings | Jan 9, 2020

NFL’s Packers and Microsoft add an innovation center to a fledgling business district

The goal is to nurture startups aligned with local industries.

Office Buildings | Jan 9, 2020

Foster + Partners to design Alibaba’s new offices in Shanghai

The firm won a design competition for the project.

Sponsored | HVAC | Jan 6, 2020

Four Ways Building Systems Create Long-term Profitability

When accounting for the total cost of ownership and the potential return on investment, owners and developers should consider total energy usage, the lifespan of building systems equipment, the recruitment and retention of occupants, and lease rates.

Office Buildings | Oct 28, 2019

LEGO opens the first phase of its new Billund, Denmark campus

C.F. Møller Architects designed the project.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021