flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM's twisting tower wins design competition for Sweden's tallest skyscraper

SOM's twisting tower wins design competition for Sweden's tallest skyscraper

The 230-meter tower scheme beat out four other finalists, including Zaha Hadid.


By BD+C Staff | June 18, 2014
The tower, called Polstjrnan, or "The Pole Star," is to be built in Gothenburg,
The tower, called Polstjrnan, or "The Pole Star," is to be built in Gothenburg, Sweden. Renderings courtesy SOM

The winner of Serneke's competition to design Sweden's tallest skyscraper has been announced. Skidmore, Owings & Merrill beat out four other finalists, including Zaha Hadid. 

The skyscraper, which will reach 230 meters and is named Polstjärnan, or "The Pole Star," is to be built in Gothenburg, Sweden.

With a 32,000-sm master plan, it will be wholly residential. At its apex, the tower will have four connected prisms, which twist 90 degrees, Arch Daily reports.

When discussing why the design won, the jury cited the plan's harmony with the larger city, calling SOM's design “an identity-building proposal that takes a smart holistic approach to both the skyscraper and the urban environment."

In addition, the jury stated the the project simply made sense economically, while providing comfortable living spaces: "The repetitive structure makes the building easy to produce cost-effectively. The homes are well-composed, with good views and good outdoor spaces in all directions. Overall, the proposal is successful in its endeavor to create an attractive urban setting and a visually striking superstructure." You can read the jury's full statement here.

The high-rise building is expected to be completed by 2019 and is the centerpiece of a new, 200,000-sm mixed-use city due to be fully completed in 2012, to celebrate Gothenburg's 400th anniversary.

All renderings courtesy SOM.

 

 

The jury consisted of:

Björn Siesjö, architect SAR/MSA City Architect Stadsbyggnadskontoret Göteborg
Anders Svensson, architect SAR/MSA, the Älvstad Project Stadsbyggnadskontoret Göteborg
Olle Lindkvist, Älvstranden Utvecklings AB
Erica Bengtsson, Environmental Strategist, Älvstranden Utvecklings AB
Ola Serneke, VD Serneke AB
Alban Herlitz, Project Development Manager Serneke AB
Louise Masreliez, architect SAR/MSA appointed by Sveriges Arkitekter
Christer Malmström, architect SAR/MSA appointed by Sveriges Arkitekter

Related Stories

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

| Mar 7, 2012

LEO A DALY opens new office in Riyadh, Saudi Arabia

Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.

| Mar 7, 2012

Turner appointed Batson-Cook CFO and treasurer

Cecil G. Hood to continue in advisory role.

| Mar 7, 2012

Thornton Tomasetti names Dowdall VP of Kansas City office

Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.

| Mar 7, 2012

LEO A DALY selected to design Minnesota Fallen Firefighters Memorial

The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.

| Mar 7, 2012

Houlihan Lokey adds Steffen to Industrials Group

Steffen bolsters group with experience in the building materials and rorest product sectors.

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 6, 2012

BLT Architects promotes two to associate

Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021