flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM's twisting tower wins design competition for Sweden's tallest skyscraper

SOM's twisting tower wins design competition for Sweden's tallest skyscraper

The 230-meter tower scheme beat out four other finalists, including Zaha Hadid.


By BD+C Staff | June 18, 2014
The tower, called Polstjrnan, or "The Pole Star," is to be built in Gothenburg,
The tower, called Polstjrnan, or "The Pole Star," is to be built in Gothenburg, Sweden. Renderings courtesy SOM

The winner of Serneke's competition to design Sweden's tallest skyscraper has been announced. Skidmore, Owings & Merrill beat out four other finalists, including Zaha Hadid. 

The skyscraper, which will reach 230 meters and is named Polstjärnan, or "The Pole Star," is to be built in Gothenburg, Sweden.

With a 32,000-sm master plan, it will be wholly residential. At its apex, the tower will have four connected prisms, which twist 90 degrees, Arch Daily reports.

When discussing why the design won, the jury cited the plan's harmony with the larger city, calling SOM's design “an identity-building proposal that takes a smart holistic approach to both the skyscraper and the urban environment."

In addition, the jury stated the the project simply made sense economically, while providing comfortable living spaces: "The repetitive structure makes the building easy to produce cost-effectively. The homes are well-composed, with good views and good outdoor spaces in all directions. Overall, the proposal is successful in its endeavor to create an attractive urban setting and a visually striking superstructure." You can read the jury's full statement here.

The high-rise building is expected to be completed by 2019 and is the centerpiece of a new, 200,000-sm mixed-use city due to be fully completed in 2012, to celebrate Gothenburg's 400th anniversary.

All renderings courtesy SOM.

 

 

The jury consisted of:

Björn Siesjö, architect SAR/MSA City Architect Stadsbyggnadskontoret Göteborg
Anders Svensson, architect SAR/MSA, the Älvstad Project Stadsbyggnadskontoret Göteborg
Olle Lindkvist, Älvstranden Utvecklings AB
Erica Bengtsson, Environmental Strategist, Älvstranden Utvecklings AB
Ola Serneke, VD Serneke AB
Alban Herlitz, Project Development Manager Serneke AB
Louise Masreliez, architect SAR/MSA appointed by Sveriges Arkitekter
Christer Malmström, architect SAR/MSA appointed by Sveriges Arkitekter

Related Stories

| Jun 5, 2012

Glumac hires Drit Shoemaker as new director of business development

Shoemaker will research, connect, and forge new client relationships with architects, developers, owners and brokers while strengthening relationships with current clients.

| Jun 5, 2012

Hoffman Architects Arbuckle elected president of New York/Tri-State DOCOMOMO

As chapter president, Arbuckle will guide and oversee the organization's efforts on behalf of Modern buildings and sites, and he will act as the main spokesperson for the organization. 

| Jun 4, 2012

Brownfield goes green

Chicago Center for Green Technology uses high-speed, energy-efficient hand dryers to share its green message and earn LEED credits.

| Jun 4, 2012

KBE Building and CTA Construction awarded Project of the Year from CMAA

Award given for work done on the renovation of Beverly High School in Beverly, Mass.

| Jun 4, 2012

Pressley promoted to Senior VP and CIO at Hill International

Pressley will be responsible for managing all of Hill's information technology systems and software worldwide.

| Jun 4, 2012

Stalco Construction promotes Scott Pavick to chief estimator

Pavick manages the estimating department and is responsible for developing cost estimates and budgets, value engineering, and subcontractor bid evaluation and negotiations.

| Jun 4, 2012

HBD Construction to build new training campus in St. Louis

Larger campus facility will expand training opportunities for plumbers and pipefitters.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

Caruso to lead Gensler’s Asia talent development

Caruso will be based in Shanghai and working with the Gensler offices in Japan, China, South Korea, Singapore, Thailand, and India until the spring of 2013.

| Jun 1, 2012

AIA 2030 Commitment Program reports new results

The full report contains participating firm demographics, energy reduction initiatives undertaken by firms, anecdotal accounts, and lessons learned.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021