flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM's twisting tower wins design competition for Sweden's tallest skyscraper

SOM's twisting tower wins design competition for Sweden's tallest skyscraper

The 230-meter tower scheme beat out four other finalists, including Zaha Hadid.


By BD+C Staff | June 18, 2014
The tower, called Polstjrnan, or "The Pole Star," is to be built in Gothenburg,
The tower, called Polstjrnan, or "The Pole Star," is to be built in Gothenburg, Sweden. Renderings courtesy SOM

The winner of Serneke's competition to design Sweden's tallest skyscraper has been announced. Skidmore, Owings & Merrill beat out four other finalists, including Zaha Hadid. 

The skyscraper, which will reach 230 meters and is named Polstjärnan, or "The Pole Star," is to be built in Gothenburg, Sweden.

With a 32,000-sm master plan, it will be wholly residential. At its apex, the tower will have four connected prisms, which twist 90 degrees, Arch Daily reports.

When discussing why the design won, the jury cited the plan's harmony with the larger city, calling SOM's design “an identity-building proposal that takes a smart holistic approach to both the skyscraper and the urban environment."

In addition, the jury stated the the project simply made sense economically, while providing comfortable living spaces: "The repetitive structure makes the building easy to produce cost-effectively. The homes are well-composed, with good views and good outdoor spaces in all directions. Overall, the proposal is successful in its endeavor to create an attractive urban setting and a visually striking superstructure." You can read the jury's full statement here.

The high-rise building is expected to be completed by 2019 and is the centerpiece of a new, 200,000-sm mixed-use city due to be fully completed in 2012, to celebrate Gothenburg's 400th anniversary.

All renderings courtesy SOM.

 

 

The jury consisted of:

Björn Siesjö, architect SAR/MSA City Architect Stadsbyggnadskontoret Göteborg
Anders Svensson, architect SAR/MSA, the Älvstad Project Stadsbyggnadskontoret Göteborg
Olle Lindkvist, Älvstranden Utvecklings AB
Erica Bengtsson, Environmental Strategist, Älvstranden Utvecklings AB
Ola Serneke, VD Serneke AB
Alban Herlitz, Project Development Manager Serneke AB
Louise Masreliez, architect SAR/MSA appointed by Sveriges Arkitekter
Christer Malmström, architect SAR/MSA appointed by Sveriges Arkitekter

Related Stories

Building Enclosure Systems | Mar 13, 2013

5 novel architectural applications for metal mesh screen systems

From folding façades to colorful LED displays, these fantastical projects show off the architectural possibilities of wire mesh and perforated metal panel technology.

| Mar 12, 2013

NYC reinvents the pay phone

New York's Reinvent Payphones competition attracts entries that transform the concept of public urban communication.

| Mar 12, 2013

'World's greenest' office building seeks tenants in Seattle

Superefficient Seattle office building is designed to meet the ambitious goals of the Living Building Challenge.

| Mar 6, 2013

Dual towers designed by SHoP create new affordable housing in NYC

With the construction of Hunters Point South, New York City will get its first large new housing development for middle-class families in more than 30 years. Related Companies is partnering with the nonprofit Phipps Houses in the project, designed by SHoP Architects with Ismael Leyva Architects.

| Mar 6, 2013

Robert Ivy, Jerry Yudelson announced as keynoters for BUILDINGChicago

Robert Ivy, FAIA, CEO of the American Institute of Architects, will be the keynote speaker at BUILDINGChicago on Tuesday, September 10, 2013. Jerry Yudelson, PE, LEED Fellow, the author of 13 books on sustainable design, will deliver the Wednesday, September 11, keynote address.

| Mar 6, 2013

German demonstration building features algae-powered façade

Exterior of carbon-neutral demonstration building consists of hollow glass panels containing micro-algae "farms."

| Mar 5, 2013

Recycled recreation: Waste-to-energy plant combines with ski resort

A new project near Copenhagen pushes the boundaries of the term "mixed use," combining a waste-to-energy plant with a ski resort.

| Mar 5, 2013

Barbara Mullenex joins Washington, D.C., office of Perkins Eastman as principal

The Board of Directors of top international design and architecture firm Perkins Eastman is pleased to announce that Barbara Mullenex RA has joined the growing Washington, DC, office as a Principal.  Mullenex joins with a distinguished career of more than 26 years of industry experience in architecture and interior design focused on hospitality and corporate interiors.

| Mar 4, 2013

Dewberry names James Draheim president of architectural practice

Dewberry, a privately held professional services firm, has recently hired James Draheim, AIA, LEED AP BD+C, as president of the firm’s 175-person nationwide architectural practice. Draheim will be responsible for all facets of the firm’s business development, operations, strategic planning, and growth.

boombox1
boombox2
native1

More In Category



Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021