Skidmore, Owings & Merrill LLP (SOM) called on downtown office building tenants like themselves to take the next step in major energy savings and exceed the Chicago Energy Challenge commitments announced by Mayor Rahm Emanuel.
Working with its own landlord at the historic Santa Fe Building, 224 S. Michigan Ave., SOM is collaborating with fellow architectural firms Goettsch Partners and VOA to partner with building owner University of Notre Dame and manager Hamilton Partners to drive energy savings beyond the 20% reduction pledged today at the Mayor’s press conference.
“Building ownership and management can control only a portion of energy use, while it is the tenants who can really move the needle of energy reduction by their consumption choices and actions,” said SOM managing partner Richard Tomlinson, who attended the Mayor’s announcement.
“Turning off our powerful computers and multiple monitors at night, better managing our office lighting, and many other techniques can take the Mayor’s energy challenge goals far beyond those announced today,” Tomlinson said. “Engaging tenants as we have done at the Santa Fe Building is the next step in energy and carbon dioxide reduction, and one that tenants will carry home to their neighborhoods.”
Hamilton Partners is preparing to equip the three architecture firms with energy-use monitors that will give the tenants real-time feedback and motivation to constantly improve the energy efficiency of their operations.
SOM began working with the Mayor’s chief sustainability officer Karen Weigert and Craig Sieben of Sieben Energy Associates in January, to identify and recruit the leadership group of buildings announced today. Many of the energy challenge organizational meetings took place in the Santa Fe Building, in the penthouse of which Daniel Burnham and Edward Bennett created the 1909 Plan of Chicago. +
Related Stories
| Oct 17, 2011
Schneider Electric introduces UL924 emergency lighting control devices
The emergency lighting control devices require fewer maintenance costs and testing requirements than backup batteries because they comply with the UL924 standard, reducing installation time.
| Oct 14, 2011
AISC develops new interoperability strategy to move construction industry forward
AISC is working to bring that vision to reality by developing a three-step interoperability strategy to evaluate data exchanges and integrate structural steel information into buildingSMART's Industry Foundation Classes.
| Oct 14, 2011
University of New Mexico Science & Math Learning Center attains LEED for Schools Gold
Van H. Gilbert architects enhances sustainability credentials.
| Oct 14, 2011
BD+C Survey on Building Information Modeling: The Good, the Bad, and the Solutions
In a recent survey conducted by Building Design+Construction, more than 75% of respondents indicated they currently use BIM or plan to use it. Respondents were also asked to comment on their experiences with BIM, what they liked and disliked about BIM, and what BIM-related advice they would give to their peers.
| Oct 14, 2011
ACI partners with CRSI to launch new adhesive anchor certification program
Adhesive anchor installer certification required in new ACI 318-11.
| Oct 14, 2011
Midwest construction firms merge as Black and Dew
Merger is aimed at increasing market sector capabilities and building on communication and core contracting competencies.
| Oct 14, 2011
AIA Continuing Education: optimizing moisture protection and air barrier systems
Earn 1.0 AIA/CES learning units by studying this article and passing the online exam.
| Oct 12, 2011
BIM Clarification and Codification in a Louisiana Sports Museum
The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D planning and coordination of the future to deliver its contemporary design.
| Oct 12, 2011
Vertical Transportation Systems Reach New Heights
Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently.
| Oct 12, 2011
Building a Double Wall
An aged federal building gets wrapped in a new double wall glass skin.