Skidmore, Owings & Merrill LLP (SOM) called on downtown office building tenants like themselves to take the next step in major energy savings and exceed the Chicago Energy Challenge commitments announced by Mayor Rahm Emanuel.
Working with its own landlord at the historic Santa Fe Building, 224 S. Michigan Ave., SOM is collaborating with fellow architectural firms Goettsch Partners and VOA to partner with building owner University of Notre Dame and manager Hamilton Partners to drive energy savings beyond the 20% reduction pledged today at the Mayor’s press conference.
“Building ownership and management can control only a portion of energy use, while it is the tenants who can really move the needle of energy reduction by their consumption choices and actions,” said SOM managing partner Richard Tomlinson, who attended the Mayor’s announcement.
“Turning off our powerful computers and multiple monitors at night, better managing our office lighting, and many other techniques can take the Mayor’s energy challenge goals far beyond those announced today,” Tomlinson said. “Engaging tenants as we have done at the Santa Fe Building is the next step in energy and carbon dioxide reduction, and one that tenants will carry home to their neighborhoods.”
Hamilton Partners is preparing to equip the three architecture firms with energy-use monitors that will give the tenants real-time feedback and motivation to constantly improve the energy efficiency of their operations.
SOM began working with the Mayor’s chief sustainability officer Karen Weigert and Craig Sieben of Sieben Energy Associates in January, to identify and recruit the leadership group of buildings announced today. Many of the energy challenge organizational meetings took place in the Santa Fe Building, in the penthouse of which Daniel Burnham and Edward Bennett created the 1909 Plan of Chicago. +
Related Stories
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 27, 2012
Consigli complete first building for Bigelow Ocean Sciences Campus
Designed by WBRC Architects Engineers in association with Perkins + Will.
| Feb 27, 2012
Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.
Intricate interior project involved construction of more than 80 offices.
| Feb 27, 2012
Research Institute at Texas Children’s Hospital building receives LEED Gold
Innovative and sustainable design reflects best environmental building practices.
| Feb 26, 2012
Milwaukee U-Haul facility receives LEED-CI Silver
The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.
| Feb 26, 2012
Hollister Construction awarded 42,000-sf office fit-out in Holtsville, N.Y.
Space leased by U.S. General Service Administration.
| Feb 26, 2012
Alvarez-Glasman & Colvin’s Chen LEED certified
Chen works closely with property owners to ensure that their properties meet and exceed all industry standards, and also provide long-term energy savings.