flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM urges Chicago tenants to partner with landlords to cut energy use

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.


By Posted by Tim Gregorski, Senior Editor | June 6, 2012
Many of the energy challenge organizational meetings took place in the Santa Fe
Many of the energy challenge organizational meetings took place in the Santa Fe Building, in the penthouse of which Daniel Burnh

Skidmore, Owings & Merrill LLP (SOM) called on downtown office building tenants like themselves to take the next step in major energy savings and exceed the Chicago Energy Challenge commitments announced by Mayor Rahm Emanuel.

Working with its own landlord at the historic Santa Fe Building, 224 S. Michigan Ave., SOM is collaborating with fellow architectural firms Goettsch Partners and VOA to partner with building owner University of Notre Dame and manager Hamilton Partners to drive energy savings beyond the 20% reduction pledged today at the Mayor’s press conference.

“Building ownership and management can control only a portion of energy use, while it is the tenants who can really move the needle of energy reduction by their consumption choices and actions,” said SOM managing partner Richard Tomlinson, who attended the Mayor’s announcement.

“Turning off our powerful computers and multiple monitors at night, better managing our office lighting, and many other techniques can take the Mayor’s energy challenge goals far beyond those announced today,” Tomlinson said. “Engaging tenants as we have done at the Santa Fe Building is the next step in energy and carbon dioxide reduction, and one that tenants will carry home to their neighborhoods.”

Hamilton Partners is preparing to equip the three architecture firms with energy-use monitors that will give the tenants real-time feedback and motivation to constantly improve the energy efficiency of their operations.

SOM began working with the Mayor’s chief sustainability officer Karen Weigert and Craig Sieben of Sieben Energy Associates in January, to identify and recruit the leadership group of buildings announced today. Many of the energy challenge organizational meetings took place in the Santa Fe Building, in the penthouse of which Daniel Burnham and Edward Bennett created the 1909 Plan of Chicago. +

Related Stories

| Jun 12, 2013

Sacred synergy achieves goals for religious education [2013 Building Team Award winner]

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.

| Jun 12, 2013

‘Talking’ Braille maps help the visual impaired

Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.

| Jun 11, 2013

Music/dance building supports sweet harmony [2013 Building Team Award winner]

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.

| Jun 11, 2013

Vertical urban campus fills a tall order [2013 Building Team Award winner]

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.

| Jun 11, 2013

Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 10, 2013

Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule

When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.

| Jun 7, 2013

Must see: Building façade made of massive concrete drain pipes

Looking to create a unique atmosphere using natural materials for the Prahran Hotel pub near Melbourne, local architect Techné Architects cleverly incorporated a series of concrete sewer pipes into the building's main façade.

| Jun 7, 2013

40 Under 40 retrospective: Where are they now?

Every month we’ll be catching up with past 40 Under 40 honorees to see what they’ve been up to since winning the award. This month we focus on a construction manager and a healthcare designer.

| Jun 7, 2013

First look: University of Utah's ‘teaching hospital for law’

The University of Utah broke ground on its cutting-edge College of Law building, which will facilitate new approaches to legal education based on more hands-on learning and skills training.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021