Skidmore, Owings & Merrill LLP (SOM) called on downtown office building tenants like themselves to take the next step in major energy savings and exceed the Chicago Energy Challenge commitments announced by Mayor Rahm Emanuel.
Working with its own landlord at the historic Santa Fe Building, 224 S. Michigan Ave., SOM is collaborating with fellow architectural firms Goettsch Partners and VOA to partner with building owner University of Notre Dame and manager Hamilton Partners to drive energy savings beyond the 20% reduction pledged today at the Mayor’s press conference.
“Building ownership and management can control only a portion of energy use, while it is the tenants who can really move the needle of energy reduction by their consumption choices and actions,” said SOM managing partner Richard Tomlinson, who attended the Mayor’s announcement.
“Turning off our powerful computers and multiple monitors at night, better managing our office lighting, and many other techniques can take the Mayor’s energy challenge goals far beyond those announced today,” Tomlinson said. “Engaging tenants as we have done at the Santa Fe Building is the next step in energy and carbon dioxide reduction, and one that tenants will carry home to their neighborhoods.”
Hamilton Partners is preparing to equip the three architecture firms with energy-use monitors that will give the tenants real-time feedback and motivation to constantly improve the energy efficiency of their operations.
SOM began working with the Mayor’s chief sustainability officer Karen Weigert and Craig Sieben of Sieben Energy Associates in January, to identify and recruit the leadership group of buildings announced today. Many of the energy challenge organizational meetings took place in the Santa Fe Building, in the penthouse of which Daniel Burnham and Edward Bennett created the 1909 Plan of Chicago. +
Related Stories
| May 14, 2014
Construction growth looking up: Gilbane Spring 2014 Economic Report
Construction spending for 2014 should finish 6.6% higher than in 2013, with nonresidential work contributing substantially.
| May 14, 2014
Prefab payback: Mortenson quantifies cost and schedule savings from prefabrication techniques
Value-based cost-benefit analysis of prefab approaches on the firm's 360-bed Exempla Saint Joseph Heritage Project shows significant savings for the Building Team.
| May 13, 2014
First look: Nadel's $1.5 billion Dalian, China, Sports Center
In addition to five major sports venues, the Dalian Sports Center includes a 30-story, 440-room, 5-star Kempinski full-service hotel and conference center and a 40,500-square-meter athletes’ training facility and office building.
| May 13, 2014
Drexel University case study report: Green Globes cheaper, faster than LEED
GBI’s Green Globes certification process is significantly less expensive to conduct and faster to complete than LEED certification, says Drexel prof.
| May 13, 2014
Steven Holl's sculptural Institute for Contemporary Art set to break ground at VCU
The facility will have two entrances—one facing the city of Richmond, Va., the other toward VCU's campus—to serve as a connection between "town and gown."
| May 13, 2014
Universities embrace creative finance strategies
After Moody’s and other credit ratings agencies tightened their standards a few years ago, universities had to become much more disciplined about their financing mechanisms.
| May 13, 2014
19 industry groups team to promote resilient planning and building materials
The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.
| May 13, 2014
Libeskind wins competition to design Canadian National Holocaust Monument
A design team featuring Daniel Libeskind and Gail Dexter-Lord has won a competition with its design for the Canadian National Holocaust Monument in Toronto. The monument is set to open in the autumn of 2015.
| May 12, 2014
Defining BIM – What do owners really want?
Given the complexities of the building process, it can be difficult for building owners to effectively communicate what they want and need with BIM. The response to the question usually is, “Give me everything.”
| May 12, 2014
The best of affordable housing: 4 projects honored with 2014 AIA/HUD Secretary Awards [slideshow]
The winners include two dramatic conversions of historic YMCA buildings into modern, affordable multifamily complexes.