flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM unveils design for 54-story mixed-use tower in Hangzhou, China

Mixed-Use

SOM unveils design for 54-story mixed-use tower in Hangzhou, China

The tower will rise 944 feet.


By David Malone, Associate Editor | April 5, 2018
The Hangzhou Wangchao center in China

Courtesy SOM | Brick Visual

Skidmore, Owings & Merrill (SOM) recently unveiled the design for the Hangzhou Wangchao Center in Hangzhou, China. The tower will add 125,000 sm of office, hotel, and retail space directly adjacent to one of the city’s new subway stations.

The tower’s silhouette is the result of an efficient structural system that minimizes wind loads with eight mega-columns that slope outward at the corners to create large, flexible floor plates. As the corner columns move farther apart, secondary perimeter columns branch out to maintain equal bays.

At the tower’s crown, the primary corner columns extend upward to a truss at the top level. Hangers and spandrels are braced back to the central concrete core with a series of struts that work in tandem to support MEP equipment and conceal the building maintenance systems.

Above the lobby, a Vierendeel transfer truss links the secondary columns to the corner columns, which creates an open lobby space below. The cladding on the undulating façade consists of planar glass panels.

"The Hangzhou Wangchao Center's distinctive silhouette derives its form from an integrated design process that solves programmatic, structural, and environmental criteria,” says SOM Design Partner, Gary Haney, in a release. “Located at the intersection of several major transportation networks, the tower is a beacon of performance-driven design and is emblematic of Hangzhou's future as a new global destination."

The Hangzhou Wangchao Center is slated for completion in 2021.

Related Stories

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

| Jul 12, 2012

EE&K and Knutson Construction selected for the Interchange in Minneapolis

Design-build contract for $79.3 million transportation hub will connect transit with culture.

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021