The partners of Skidmore, Owings & Merrill LLP (SOM) announced they are launching a new design studio as part of their West Coast practice. Leading the new studio are three former SOM architects: Michael Mann, FAIA; Paul Danna, AIA; and Jose Luis Palacios, AIA.
Mann's career began at SOM and he has worked on significant Los Angeles-based projects including SOM's Gas Company Tower. He has directed and managed major domestic and international projects throughout his 30-year career and he will serve as L.A. Practice Leader/Management for SOM's Los Angeles design studio.
Danna's connection to SOM began when he won the SOM Foundation Traveling Fellowship upon graduation from Harvard's GSD program. His two-decade career includes diverse, highly recognized and award-winning projects including numerous LEED Gold-certified buildings. He is a leader in the Los Angeles design community and has served as President of AIA|LA and he is on the Board of the Architectural Guild of the University of Southern California's School of Architecture.
Palacios' career began at SOM. His work entails a broad range of building types including the design of civic, government and public safety complexes. His work includes the recently completed LAPD Headquarters and he has designed stations for the California High Speed Rail project. Jose has most recently taught at the University of Southern California School of Architecture. He will work as L.A. Practice Leader/Design for SOM's Los Angeles studio.
SOM's presence in Southern California - until recently driven by the firm's San Francisco office - includes significant new commissions such as UCLA's new Medical Education Building which will become a new front door for the campus and the Medical School; a new mixed-use project at UC Santa Barbara and a new courthouse for the Superior Court of California in San Diego which will be the State's largest. These projects are directly in line with the firm's commitment to urban, environmental and social sustainability. BD+C
Related Stories
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.