flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM-designed HQ will provide new riverfront space for C.H. Robinson

Office Buildings

SOM-designed HQ will provide new riverfront space for C.H. Robinson

Over 1,000 employees will work in the HQ building when completed.


By David Malone, Associate Editor | February 7, 2017

Rendering courtesy of SOM

A vacant four-acre property that was the former site of the Gutmann Leather Tannery at 1515 N. Webster in Chicago will soon become the new home of C.H. Robinson’s headquarters building.

The site was purchased by Sterling Bay in 2015 for $21.3 million, according to Curbed Chicago, and shortly after a 15-year tenant agreement was signed with C.H. Robinson. The SOM-designed will provide 207,000 sf spread across its four floors.

In addition to the office building itself, there will also be an outdoor amenity space, a new walking trail, and green space along the eastern bank of the Chicago River. Parking will be available to employees in the form of a below grade lot and an adjacent surface lot.

The headquarters project received its construction permit at the end of January and is expected to be completed in 2018. The facility will house around 1,000 C.H. Robinson employees.

Related Stories

Office Buildings | Jan 14, 2016

JLL: Slowdown not expected for office market

The booming sector had an occupancy growth rate 1.3 times that of new supply in the fourth quarter of 2015.

Office Buildings | Jan 11, 2016

Spec for tech: Designing for the creative class

The new work environment, settings which blur the line between work and life, is inspired by cities and the attributes that all great urban environments share, writes Ben Tranel of Gensler.

Office Buildings | Jan 6, 2016

4 tips for creating flow in a multi-level workspace

Successful workplaces enable a clear progression of ideas and people, which can be challenging for workplaces that occupy multiple levels. Perkins+Will's Sarah Stanford found some strategies that have proven successful.

Office Buildings | Dec 23, 2015

Good design alone won’t eradicate mindless meetings

Gensler's Johnathan Sandler discusses efficient alternatives to dull, wasteful workplace meetings. 

Office Buildings | Dec 17, 2015

John Buck Company to develop CNA’s Chicago headquarters

The 35-story building will have plenty of column-free space.  

Office Buildings | Dec 9, 2015

HOK collaborates with IFMA on new workplace strategy research report

Report cites work-life balance as the top reason for implementing “distributed work” strategies.

Greenbuild Report | Dec 8, 2015

Is ‘green’ still a selling point in the office sector?

Some developers are missing an opportunity by downplaying sustainability at a time when demand for such features is palpable among lessee firms who are trying to attract younger workers.

Energy Efficiency | Nov 16, 2015

Amazon will heat its new Seattle campus with waste heat from next-door data centers

Up to 4 million kilowatt-hours of energy will be saved each year.  

Office Buildings | Nov 6, 2015

Real Madrid to get new headquarters designed by Rafael de La-Hoz

The design of the building is made of a set of two parallelepiped-shaped volumes. 

Office Buildings | Nov 3, 2015

Emotional intelligence and design

In a world in which technology and its skills are constantly changing, good people skills are becoming more important, writes VOA's Angie Lee.

boombox1
boombox2
native1

More In Category


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021