flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM-designed HQ will provide new riverfront space for C.H. Robinson

Office Buildings

SOM-designed HQ will provide new riverfront space for C.H. Robinson

Over 1,000 employees will work in the HQ building when completed.


By David Malone, Associate Editor | February 7, 2017

Rendering courtesy of SOM

A vacant four-acre property that was the former site of the Gutmann Leather Tannery at 1515 N. Webster in Chicago will soon become the new home of C.H. Robinson’s headquarters building.

The site was purchased by Sterling Bay in 2015 for $21.3 million, according to Curbed Chicago, and shortly after a 15-year tenant agreement was signed with C.H. Robinson. The SOM-designed will provide 207,000 sf spread across its four floors.

In addition to the office building itself, there will also be an outdoor amenity space, a new walking trail, and green space along the eastern bank of the Chicago River. Parking will be available to employees in the form of a below grade lot and an adjacent surface lot.

The headquarters project received its construction permit at the end of January and is expected to be completed in 2018. The facility will house around 1,000 C.H. Robinson employees.

Related Stories

| Mar 20, 2012

New office designs at San Diego’s Sunroad Corporate Center

Traditional office space being transformed into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

| Mar 13, 2012

China's high-speed building boom

A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.

| Mar 13, 2012

Worker office space to drop below 100-sf in five years

The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.

| Mar 12, 2012

Improving the performance of existing commercial buildings: the chemistry of sustainable construction

Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 1, 2012

Reconstruction Awards: Reinvesting in a neighborhood’s future

The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.

boombox1
boombox2
native1

More In Category


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021