On January 19, AmericanAirlines Arena in Miami will relaunch its 23,000-sf East Plaza, which has been retrofitted into a solar pavilion whose canopy includes 14 circular translucent panels that utilize Building Integrated Photovoltaic solar technology.
This transformation is the result of a business partnership between The Miami Heat professional basketball team, which plays at the Arena, and NRG Energy. Last year, AmericanAirlines Arena became the first sports and entertainment facility in the world to be recertified as LEED Gold.
The Heat Group manages this 16-year-old arena, which is county owned and sits on city-owned property. The Heat Group purchased the canopy from NRG, which hired Skanska as the retrofit project’s general contractor. DLR was the architect and structural and MEP engineer.
Jim Spencer, AmericanAirlines Arena’s Vice President of Operations, tells BD+C that the solar pavilion provides a practical answer to the question of how to get more bang out of the open-air East Plaza, which looks onto Biscayne Bay but was being used sparingly because of Miami’s hot, humid, rainy weather conditions.
John Vidalin, The Heat Group’s Chief Revenue Officer, adds that these conditions severely limited the facility’s ability to attract sponsoring partners to that area. (Levy Restaurants is the pavilion’s food and beverage partner, and Barcardi, which is already an arena sponsor, will host a horseshoe-shaped bar in the pavilion’s atrium.)
The canopy offers shade and cover to the East Plaza, and the solar panels, which are 16 to 24 ft in diameter each and take up 5,000 sq ft of cover space, will provide an offset to the arena’s energy consumption. Vidalin and Spencer say the pavilion extends the stadium’s footprint and reinforces the building’s certification story. (All of the furniture in the Plaza are made from recycled milk jugs.)
The canopy, says Spencer, is supported by 12 columns, five of which feature 360-degree nanolumen LED displays. The Heat Group has sold the entitlement rights for the Plaza to Xfinity, Comcast’s high-speed Internet and on-demand service, which will deploy full WiFi for the Plaza and has built an 8x12-ft X-1video wall, where visitors can engage with an activation team and a variety of sports and music streaming events.
The pavilion will be open for all of the arena’s sports and concerts. Vidalin says the canopy now makes the Plaza more attractive for conducting other revenue-generating functions like corporate and charity events, group sales, and post-game parties. “It’s really going to be an elegant space,” he says. He adds that the Arena’s ongoing energy efficiency improvement—which included upgrading its building management and HVAC systems to achieve LEED Gold—is a strong selling point for sponsors.
Vidalin had previously worked with NRG when he was with the Houston Texans and San Francisco 49ers football teams. He notes that the East Plaza pavilion allows the energy company, which hadn’t operated in Miami before this, to “plant its flag” in the city, which is a gateway to Caribbean and South American markets.
“We are in the midst of a social movement that demands attention to clean energy,” says David Crane, NRG’s former chief executive. “As the world’s perspective on energy continues to evolve, it will be critically important for business leaders—foreign and domestic—to see and invest in the incredible potential [of] renewable energy, especially built with a design aesthetic in mind.”
Related Stories
Sports and Recreational Facilities | Apr 11, 2016
Chicago Cubs continue Wrigley Field renovations with new clubhouse
The team found 30,000 sf of space underneath an old parking lot, nearly tripling the size of the old clubhouse.
Sports and Recreational Facilities | Apr 6, 2016
Las Vegas debuts another new arena, with a number of ‘firsts’
The gambling mecca has its eyes on attracting a pro sports team.
Sports and Recreational Facilities | Apr 5, 2016
The importance of true cost-modeling for sports facilities
Many factors prevent sports facilities from immediate profitability. Rider Levett Bucknall’s Peter Knowles and Steve Kelly write that cost modeling, the process of estimating construction expenses by analyzing fixed and variable expenses, can push facility development to financial success.
Sports and Recreational Facilities | Apr 1, 2016
San Diego Chargers announce plan for downtown stadium and convention center
The project will be funded primarily by a tax increase on hotel stays.
Sports and Recreational Facilities | Mar 31, 2016
An extreme sports tower for climbing and BASE jumping is proposed for Dubai’s waterfront
The design incorporates Everest-like base camps for different skill levels.
Sports and Recreational Facilities | Mar 29, 2016
New skatepark complex has three levels of surfaces and obstacles
Guy Hollaway Architects designed an indoor 10,700-sf park in Folkestone, England, to accommodate BMX biking, skateboarding, and other extreme sports.
Sports and Recreational Facilities | Mar 25, 2016
Minnesota Timberwolves join pack of NBA teams with new high-res video screens
The Wolves, Charlotte Hornets, and Sacramento Kings have new multi-paneled center-hung displays planned for their arenas.
Sports and Recreational Facilities | Mar 24, 2016
Barcelona hoops arena will rattle opponents with wall of raucous fans
HOK and TAC Arquitectes designed a basketball palace that will have intimate seating inside and public space outside.
Sports and Recreational Facilities | Mar 18, 2016
Milwaukee Bucks reveal more renderings of new downtown arena project
The plan, led by Populous, includes a 714,000-sf arena and a 30-acre mixed-use development.
Sports and Recreational Facilities | Mar 14, 2016
Washington Redskins tease new stadium model designed by Bjarke Ingels
The location isn't yet determined, but the new stadium will have a moat for kayaking.